Search the web
Sign In
New User? Sign Up
CHICAGOTRANSIT · The Chicago Transit mailing list. Devoted to the discussion of trains, buses, transit, urban traffic infrastructure issues,
? Already a member? Sign in to Yahoo!

Yahoo! Groups Tips

Did you know...
Hear how Yahoo! Groups has changed the lives of others. Take me there.

Best of Y! Groups

   Check them out and nominate your group.
Having problems with message search? Fill out this form to ensure your group is one of the first to be migrated to the new message search system.

Messages

  Messages Help
Advanced
Messages 43377 - 43406 of 52004   Oldest  |  < Older  |  Newer >  |  Newest
Messages: Simplify | Expand   (Group by Topic) Author Sort by Date ^
43377
... Clybourn. ... Subways dug so deep on streets such as Clybourn because they dug in from soft clay to hard rock as other tunnels dig between both streets ...
Alfie Martin
alfiemrtn3
Offline Send Email
Nov 1, 2007
8:24 am
43378
There's also the same shiny stuff on the new flyers also so far only seen it one of the 800's out of kedize ... ...
Barry Bonds
daiz20
Online Now Send Email
Nov 1, 2007
12:02 pm
43379
... I think I wrote that bit. ... I've said this several times. The main use of the emergency bypass would be an alternate route into Chicago Union Station...
Adam H. Kerman
ahkatchinetd...
Offline Send Email
Nov 1, 2007
1:31 pm
43380
... What Chicago subways are examples of extensive cutting through hard rock? I know we have very tall buildings anchored to bedrock and I know that part of ...
Adam H. Kerman
ahkatchinetd...
Offline Send Email
Nov 1, 2007
2:06 pm
43381
Let's say a new connection to the St.Charles Air Line and a McCormick Place station would cost $30 million, is this too much to provide some connection between...
Harvey Kahler
hkahler400
Offline Send Email
Nov 1, 2007
2:26 pm
43382
I will say one thing, the State Street subway north of Grand is very smooth. It will be nice when they're done with the tie replacement! We ran 25mph and you...
eric
vxla
Offline Send Email
Nov 1, 2007
4:50 pm
43383
Hi List; Are the Red Line slow zones in place because the tracks are in bad shape, the track supporting structure is in bad shape or both? Gene King...
Eugene King
genekin7320
Offline Send Email
Nov 1, 2007
5:04 pm
43384
... It looks like there's track work being done just south of Wilson today. A southbound train ran express from Granville to Wilson, which I then boarded. It...
Eric Pancer
vxla
Offline Send Email
Nov 1, 2007
5:20 pm
43385
At this point, Red Line slow zones seem to be mostly the track-related. Crews were everywhere today. It took an hour to go from Howard to Chicago. All the...
Harvey Kahler
hkahler400
Offline Send Email
Nov 1, 2007
7:12 pm
43386
... Did you see that track 3 at Fullerton is going in place? It looks like the track is in place, but the concrete hasn't been poured yet. A strange order of...
Eric Pancer
vxla
Offline Send Email
Nov 1, 2007
7:37 pm
43387
... Well, as you're no doubt aware, the reason that there is only one through route of National Rail through London (Thameslink) is that when the railways were...
Chris Hansen
chrishansenhome
Offline Send Email
Nov 1, 2007
7:38 pm
43388
Can anyone tell: Is CTA still installing worn running rail as the third rail, or are they installing aluminum as they did in Skokie? I haven't looked carefully...
Adam H. Kerman
ahkatchinetd...
Offline Send Email
Nov 1, 2007
7:49 pm
43389
This track laying process is the same as for track 1 in the Fullerton Reconstruction Album. Special positioning frames hold the rail with a tie plate attached...
Harvey Kahler
hkahler400
Offline Send Email
Nov 1, 2007
8:19 pm
43390
The 3rd rail is steel (100# ARA?) with aluminum bars Huck-bolted to both sides for electrical conductivity, and with 4-hole aluminum joint bars. The removed...
Harvey Kahler
hkahler400
Offline Send Email
Nov 1, 2007
8:29 pm
43391
I was a security guard for years at various office buildings in the 1980's and 1990's. If you think lobby guards don't read on duty, especially in the evenings...
ajk100@...
ajkristopans
Offline Send Email
Nov 1, 2007
10:59 pm
43392
... Troll....
Eric Pancer
vxla
Offline Send Email
Nov 1, 2007
11:05 pm
43393
The 500's don't either. ... (touch card reader on the wheel well)....
PJ
choochoopw
Offline Send Email
Nov 2, 2007
12:13 am
43394
... They're also not 40 feet long....
Robert J Madison
rmadisonwi
Offline Send Email
Nov 2, 2007
12:23 am
43395
In downtown Chicago, bedrock is about 90 feet below the surface, so rock was not a consideration in subway tunneling and construction. There is, however, one...
Dennis McClendon
southlooplis...
Offline Send Email
Nov 2, 2007
12:53 am
43396
point taken ... They're also not 40 feet long. ... Graham Garfield's great Chicago L site: http://www.chicago-l.org Yahoo! Groups Links ...
PJ
choochoopw
Offline Send Email
Nov 2, 2007
1:36 am
43397
Seems like three places needed to be blasted along the Milwaukee extensions from Logan Square: Addison, Montrose & Jeff Park. Dennis McClendon...
Harvey Kahler
hkahler400
Offline Send Email
Nov 2, 2007
2:47 am
43398
The tunnel just east of Central on the Forest Park line? ... From: Harvey Kahler <harvey.kahler@...> Date: Thu, 1 Nov 2007 19:47:20 ...
eric
vxla
Offline Send Email
Nov 2, 2007
2:50 am
43399
... and ... displayed by many ... with ... Well, I don't know if she's a troll. I'd just say that she might want to turn down the volume of her posts if she...
nextstopchicago
Offline Send Email
Nov 2, 2007
3:13 am
43400
Indeed, I was thinking of the small ridge of rock visible alongside the Kennedy Expressway near Addison. I can't speak definitively about any other location....
Dennis McClendon
southlooplis...
Offline Send Email
Nov 2, 2007
3:51 am
43401
I posted new photos of Howard Terminal progress. Roof girders with a shallow arch for a vaulted ceiling are up. These pay homage to the Palladian window...
Harvey I Kahler
hkahler400
Offline Send Email
Nov 2, 2007
3:53 am
43402
I'm not the moderator; but sometimes members need to stand up. Elizabeth may be a little defensive; but some of the comments have been insensitive as well....
Harvey Kahler
hkahler400
Offline Send Email
Nov 2, 2007
4:18 am
43403
"Netiquette Guidelines" * [image: Troll, internet troll & forum troll] * *What is an Internet Troll/ Forum troll? * An "*Internet troll*" or "*Forum Troll*"...
Snatch N. Grabster
goodfordates
Offline Send Email
Nov 2, 2007
4:26 am
43404
Thanks Harvey, Was going to email you and tell you I was driving under Howard Street CTA viaduct and notice they are replacing it....
James
jamesf79
Online Now Send Email
Nov 2, 2007
4:29 am
43405
I agree with Elizabeth. When I was in Boston I went to the Porter Square Red Line station and met a C/A who was totally fantastic. As a matter of fact each ...
Larry M
minnman55421...
Offline Send Email
Nov 2, 2007
6:28 am
43406
S. Shore faces suit after crash November 1, 2007 - Post-Tribune VALPARAISO, IN -- A LaPorte County couple has filed suit against the South Shore Line...
dennismk12002
Offline Send Email
Nov 2, 2007
8:35 am
Messages 43377 - 43406 of 52004   Oldest  |  < Older  |  Newer >  |  Newest
Advanced
Add to My Yahoo!      XML What's This?

Copyright © 2009 Yahoo! Inc. All rights reserved.
Privacy Policy - Terms of Service - Guidelines - Help