Search the web
Sign In
New User? Sign Up
quickchangeover · This list is a monthly newsletter dedicated to quick changeover of packaging, assembly and manufacturing lines.
? Already a member? Sign in to Yahoo!

Yahoo! Groups Tips

Did you know...
Real people. Real stories. See how Yahoo! Groups impacts members worldwide.

Best of Y! Groups

   Check them out and nominate your group.
Having problems with message search? Fill out this form to ensure your group is one of the first to be migrated to the new message search system.

Messages

  Messages Help
Advanced
Messages 95 - 124 of 127   Newest  |  < Newer  |  Older >  |  Oldest
Messages: Show Message Summaries   (Group by Topic) Sort by Date v  
#124 From: John R Henry <johnhenry@...>
Date: Sat Sep 26, 2009 6:28 pm
Subject: Lean Changeover Newsletter-September 2009 (Unexpected & Amerivap)
johnrhenrypr
Offline Offline
Send Email Send Email
 




(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) SEPTEMBER 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com
or contact me at < mailto:john%40changeover.com >john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

We’ll be in booth S4941 at PackExpo next week. Will you be there? If so, stop by and say hello. At the least, you can pick up a “Be Lazy!” If you feel adventurous, take the 1 minute changeover challenge and win a hat.
 
SOME THOUGHTS ON…
EXPECT THE UNEXPECTED

Anyone who has ever dealt with machinery knows that even the simplest machines can be full of surprises. It often seems that recurring malfunctions happen at random but in my experience this is seldom the case. Whatever happens does so for a reason. Finding that reason is the key to fixing the problem. Finding that reason is often more difficult than fixing the problem.

Pattern recognition is a tool that most humans have hardwired into our brains without realizing it. Loosely speaking, it is the ability to take seemingly random data points, and organize them and pick out patterns almost by instinct. Not realizing we have this tool, some may fail to use it as much as they should.

In the 80’s I was working with a dairy to implement a new style cap on half-gallon plastic bottles. This was a difficult application as the bottles had very weak plastic necks. To apply the cap so that it did not leak required perfection throughout the process. After weeks of struggle, we finally got the caps to run fairly reliably but would still get a leaker every couple of minutes. After much time watching the machinery without seeing anything wrong, it dawned on me that there might be a regularity to the leakers and I started timing how often they occurred. The time interval was not constant but turned out to always be a multiple of about 2 minutes. Working back to the machine, we looked to see what happened every 2 minutes and found that 1 specific filling head (of 24) lined up with 1 specific capping head (of 7) every 168 bottles. When they aligned, there would often be a joggle that would prevent the cap from going on squarely. Further investigation found that a drive sprocket had a chipped tooth causing the problem. It took us a couple days to find this but, absent the initial recognition of the pattern, we might be looking still.

In another bottling plant, I once installed a pressure sensitive labeler. It worked fine on startup and for a month or two after. Then I started getting calls that it would go nuts, dispensing labels when there was no bottle. I would go to the plant and it would be working fine with no problems I could see. After much head scratching and discussion, I found that the problem only happened around 11:00AM  each day, would last for a while and then disappear. It turned out that when the sun shined through a window at a certain angle, it would strike the labeler photoeye, triggering the labeler. It had not happened when I started the labeler because the sun never reached the proper angle. The solution was simple, we put a screen to prevent the sun hitting the photoeye. Figuring it out was tough because the problem seemed, at first, did not seem to have a cause. 

Another case I was involved with was an inkjet printer that would, periodically print a series of illegible codes before returning to normal. There did not seem to be any rhyme or reason to it until we noticed that it only happened when a forklift would go through a door. This caused enough of a draft that it would knock the ink dots out of position as they traveled across the gap between print head and product. Once more, easy to fix, but only after we had figured out the cause.

The moral of these stories is that every effect has a cause. Recognizing that the malfunctions really do have a pattern can often help trace it back to the actual cause. Once the cause is found, it can be eliminated. Until it is found, we are tilting at windmills.
 
TIP OF THE MONTH…
STEAM CLEANING

We all know that steam can be an effective cleaning and sanitizing agent. We also know that steam can be difficult to control and that regular plant steam may not be clean or dry enough to be suitable.
Amerivap systems makes dry steam generators that can be rolled to point of use. They are specifically designed for cleaning and easy safe handling. They have specialized systems that are purpose designed for inline cleaning of conveyor belts.

You can check them out on their website at www.amerivap.com

Best,

John R Henry CPP

"All progress is made by a lazy person looking for an easier way." - Lazarus Long

Cell 787-550-9650 www.changeover.com

Visit Changeover.com at PackExpo in booth S4941
Register free at www.packexpo.com use code 24X78 at checkout



Best,

John R Henry CPP

"All progress is made by a lazy person looking for an easier way." - Lazarus Long

Cell 787-550-9650 www.changeover.com

Visit Changeover.com at PackExpo in booth S4941
Register free at www.packexpo.com use code 24X78 at checkout



#123 From: John R Henry <johnhenry@...>
Date: Tue Aug 11, 2009 3:25 pm
Subject: Lean Changeover Newsletter-August 2009 (Creativity & Cylinder lock)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) AUGUST 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com
or contact me at john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

If you are going to PackExpo Las Vegas in October, please be sure to visit the Changeover.com booth at S-4941 in the South Hall. I'll have the Super Duper Monster Maker changeover simulators and am inviting all comers to take the 1 Minute Challenge. Prizes galore for winners.

If you want to learn about packaging machinery, I will be teaching the IOPP course Packaging Machinery: Basics and Beyond once again at The Frain Group in Chicago on September 14-16. This is a chance to learn about all the major types of packaging machinery. The Frain location allows us to get hands-on. Whether new to the industry or an old hand who wants to expand their horizons, this is the opportunity for you. Full information can be found at:

http://www.iopp.org/i4a/pages/index.cfm?pageid=1373

SOME THOUGHTS ON…
IDEA FINDING

If we continue to do the same old thing we will continue to get the same old results.

There are several reasons why some plants see very few new ideas while others are innovating every day.

Perhaps the main one is simply that most people don't want to leave their comfort zone. They have been doing things this way for a long time, it seems to work OK, why change now? Part of this is inertia but part of it is also due to a fear of failure. "What if the new way is worse?" All innovation is, to some extent, a gamble so this fear is not completely irrational.

This reluctance to change shapes the vision. The person who wants to improve the process will have their eyes constantly open looking for ideas. These ideas come from a variety of sources. One person might look at the ceramic cooktop in their kitchen at home and think that a smooth surface would improve cleanability of machines. This might lead them to think about how protrusions and crevices can be eliminated from machine surfaces.

Lack of exposure can inhibit creativity. If all a person sees is their department, plant, industry, they may never independently come up with improvements that are common elsewhere.

Some plants are running so hard that, as the IBM ad I use in my workshops says "Innovative thinking? We don't even have time for bad thinking." Stress can be a real idea killer

A very real culprit in many plants is the company culture. Some cultures tend to emphasize the idea that the people are there to work, not to think. This is obviously counterproductive, but all too common. If a company discourages creativity, they will get very little of it. They may not want to discourage innovation and may not even realize that they are doing so. No matter, the end result is the same. 

So how to break out of this cycle? How do you inspire new thinking and creativity?

To some extent, this is a management problem. If it is the culture that is retarding creativity, management needs to change the culture. This is easier said than done. It is not something that will happen overnight, either. The first thing management must do is listen. Too often I hear from my clients both "We have trouble getting our people to think creatively" (management) as well as "Management never pays attention to our improvement ideas." (Plant floor)

This comes back to communication. Management and the floor are just not communicating with each other. When a mechanic or operator has an improvement idea, there must be a way to bring that to management's attention. Bringing it to management's attention is not enough. If that is all that happens, it is not enough. Management must respond positively. Positive response does not mean that they must accept the idea. It does mean that they have to listen and explain why they are not accepting it and this explanation needs to be couched in a positive manner.

Management must reward success. This reward does not necessarily need to be anything fancy. Sometimes it can be as simple as a verbal "well done". It can also include recognition in a company newsletter, bulletin board or other venues. For significant improvements, it may even include more tangible rewards. Saying, "They are just doing their job, why should they expect something special?" may be technically correct, but it will also kill creativity.

In addition to rewarding success, management must reward failure. Not every idea, no matter how carefully thought out and implemented, will turn out as hopped. It is still necessary to recognize the attempt and use this as a springboard for the next idea.

Management must also provide resources. This may include training (Call me!) brainstorming sessions, visits to other plants in similar as well as different industries, trade shows and conferences or books, periodicals and videos. Time and money for experimentation is a must.

I have seen several great ideas come from where they might be least expected. I was doing a workshop in a plant where the operators had to place a very small date label on each case. This was done completely manually. One of the operators asked if it might be possible to use a price gun as used in stores. At lunch, we went out and bought one at Office Max and had it in use the next day. This was a time and ergonomic improvement. It was also a morale improvement.

Another plant adopted the idea of a thermoformed parts storage tray after seeing how a McDonalds organized and stored the parts for their milk shake machine.

The moral of the story is to simply keep your eyes open wherever you go. You never know when you will see something useful. 

There is tremendous creativity stored up in your workplace. Set it free and watch it bloom.


TIP OF THE MONTH…
CYLINDER LOCK PNEUMATIC CLAMPS

Edward Segen company makes a line of pneumatic clamps for the plastic molding industry. I've been recommending them for years for a variety of non-molding applications as well.

They consist of 2 parts:

A static, male, piece is fastened to the part. This is conical so that it is self-aligning and has a ball on the end for locking.

A pneumatic, female, mechanism is mounted on the machine. This uses air to open, spring to close. With the mechanism is pressurized, the mold is placed on top inserting the conical sections. Air pressure is released and the part is solidly locked in place.

For more information, including video, visit:

  http://www.segen-online.com/



Got lemons? Make lemonade

I know that times may be a bit rough for some of your companies with slow production. Look at it as an opportunity rather than a problem. When things are good and you can't make enough product to meet demand, you do not have time to train, do maintenance, work on process improvement.

Now is the perfect opportunity. These things do not cost much, keep your valuable staff productively busy and help morale. When things do come back to normal, and they will, you will be ready.

I can help you implement these programs. Give me a call at 787-550-9650 or e-mail john@...

Best,

John R Henry CPP

"All progress is made by a lazy person looking for an easier way." - Lazarus Long

www.changeover.com www.smedblog.com


#122 From: John R Henry <johnhenry@...>
Date: Tue Jul 14, 2009 1:28 am
Subject: Lean Changeover Newsletter-July 2009 (Haste & Tool Band-It)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) JULY 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com
or contact me at john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

Got lemons? Make lemonade

I know that times may be a bit rough for some of your companies with slow production. Look at it as an opportunity rather than a problem. When things are good and you can't make enough product to meet demand, you do not have time to train, do maintenance, work on process improvement.

Now is the perfect opportunity. These things do not cost much, keep your valuable staff productively busy and help morale. When things do come back to normal, and they will, you will be ready.

I can help you implement these programs. Give me a call at 787-550-9650 or e-mail john@...



SOME THOUGHTS ON…
WASTE KILLS HASTE

We all know the phrase "Haste makes waste". I learned this back in the 70's on a strip packaging machine that, if run at its rated 60PPM would produce about 40% rejects. If run at 45PPM, it would produce about 2% rejects. I could never get the packaging manager to understand that. Every time I would turn the machine down, he would crank it back up. Although it looked like it was running faster, at the end of the day output was less. Much of the rejected output could be reworked but that rework time itself was waste. Additionally, there was the wasted product and materials.

This idea works the other way as well. That is, waste kills haste. (I am probably misusing the word haste her to make a point) Most production processes work at considerably less than optimum capacity. The main reason for this in many plants is that lines spend a considerable amount of time not working at all.
Some, of this downtime is unavoidable. Lines that run more than a single product will require downtime for changeover, for example. Changeover will always occur but it does not have to take as long as it normally does. In my experience there is always a lot of wasted effort in changeover. Wasted effort translates to wasted time. I use the ESEE (Eliminate, Simplify, Externalize, Exactly) tool to get at this waste. I've spoken about it before so will not belabor it here. E-mail me john@... if you want more info. I will say that unless you have already implemented a changeover reduction or SMED program, I can guarantee that you have lots of opportunities, most of them free.

Other causes of downtime may be avoidable. Maintenance is too often viewed as avoidable downtime. That is, too many plants take the attitude that they need to get the production out and do not have time for maintenance downtime. The end result is that the line runs til it breaks. Then, because there is no time to perform the correct repair, a temporary repair is made. I have no serious objection to temporary repairs, provided that they are temporary. I have seen too many cases where they have become permanent. In one case, a spring broke on a machine and was replaced with a rubber band. I can live with that. However, it had happened about a year before and they still had the rubber band. Since the rubber band would break regularly, they had even installed a little cup so they could have a supply of bands at hand. While this reduced the stoppage each time the band broke, had they replaced the spring, the stoppages would have been eliminated.

Schedule downtime for maintenance, both repair and preventive. Make sure that it gets done. This will reduce line stoppages as well as producing better product.
One would think that lack of materials would not be a problem in modern plants yet I have run across this more often than I think I should. Sometimes it is lack of product. A product will be scheduled to run, the inventory system will show everything in stock, the line will be setup and only then will it be discovered that some component is not available. This may be an error in the system, showing material that is not there. It may also be due to damaged product. There may actually be 20 cases of components on the warehouse shelf but the system may not show that 5 cases were damaged by a forklift.
In one case, a critical component, hot-melt glue pellets was not included in the Bill Of Materials (BOM) as it was considered a supply and maintained in a separate inventory system. For whatever reason, it ran out and the plant was stopped for 2 days because they could not glue cases shut. ALL materials required for production need to be included in the BOM.

The best way to avoid these problems is to have a staging area with all product and components staged two lots ahead. While product A is being run, everything required for Product B has been taken from the shelves and staged. Product C is in the process of being taken from the shelves and staged. If there are problems, they can be caught ahead of time and corrected without costing downtime.
Waiting for documentation can be another waste. As with materials, this should be prepared 2 batches ahead. This allows for any problems to be resolved without loss of production time.

Want more haste? (In the sense of increased production)

Get rid of waste!


TIP OF THE MONTH
TOOL BAND-IT

Billy Mays, pitchman extraordinaire died last month. In tribute to him my tip this month is one of his last products and one that was featured on his "Pitchmen" TV show. It is one of those ideas so simple that many of us wonder why we did not come up with it.

The Tool Band-it is an armband with magnets sewn inside. Worn on the upper arm it allows you to stick tools, parts and anything metallic to your arm for easy access. That's pretty much it. (I said it was simple)
My wife tells me that I can go to the beach and not find sand. I am constantly laying tools or anything down and then not being able to find them. I spent so much time looking for my glasses that a while back I gave up on looking cool and now keep them on a string around my neck. This product was made with me in mind.
Technicians, when working on machines will frequently lay tools and bolts on top of the machine. A risk is that they will get knocked off onto the floor or into the machine wasting time looking for them. An even greater risk is that they may be knocked into the machine and not be found then cause severe damage when the machine is restarted. A while back I recommended magnetic base pans, available at auto supply houses to provide a place to lay parts.

This may be better.

See it here https://www.toolbandit.com

ATTENTION READERS: I do have a question and would appreciate some advice if you know.
The Tool Band-It has strong magnets. I am wondering if this would pose any risk around electronic equipment such as PLC's and controls? If anyone knows, could you send me an e-mail john@... If necessary.


Best,

John R Henry CPP

"All progress is made by a lazy person looking for an easier way." - Lazarus Long

www.changeover.com www.smedblog.com


#121 From: John Henry <johnhenry@...>
Date: Mon Jun 1, 2009 9:01 pm
Subject: Lean Changeover Newsletter-June 2009 (Changeover program & Book recommendation)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) JUNE 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com
or contact me at <mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

I know that for many of you things may be a bit
slow right now. That makes this the perfect time
to do training and implement a changeover
improvement program. This newsletter will tell
you how but I can do a much better job with my
CHANGEOVER MADE ESEE workshop. For those
subscribers to the newsletter, I want to extend a
special offer. The workshop is normally $5,000
plus travel (in the US) but I am offering it here
for $4,000. I have availabilities in July and
August or, if you are in a big hurry, even next
week. Give me a call at 787-550-9650 or e-mail me
at 787-550-9650 and I will be happy to provide a
detailed course outline or answer any other questions.

Do it NOW!

SOME THOUGHTS ON…

DEVELOPING A LEAN CHANGEOVER PROGRAM

You know that you need to reduce changeover
downtime. The problem is how to tackle it.
Changeover is such a massive issue, affected by
and affecting virtually everyone in the company,
that it terrifies many people. This fear leads to
indecision about how to start, indecision leads
to nothing at all being done and the high costs
of changeover continue year after year into the future.

To start, you need a formal program. Here is a
step by step process for getting the program going:

1.      Calculate the cost of changeover - This
must be the first step and must be done by the
finance department. Anything else is unofficial
and will have credibility issues. Improving
changeover will cost money. Generally not major
capital expenses, though there can be some, but a
lot of relatively small expenses as well as time.
If the cost of changeover is not known, it is
impossible to evaluate whether improvements make
sense. (If you want to know more about costs,
drop me an e-mail at john@... and I'll
send you a presentation I did on costs)

2.      Decide that a program will be implemented
and set a timetable - Talking about improving
changeover is not a program. Putting it off
doesn't make it get any better. Just do it. The
timetable, initially, is for getting the program
going, not necessarily accomplishing reductions.
It takes an effort and if there is no deadline it
will get pushed back into never-never-land.

3.      Develop metrics to measure changeover
times - As the saying goes, if you don't measure
it, you won't control it. Decide what you will
measure as well as how you will define it and how
you will measure it. Absent good metrics there is
no way to know if changeover is getting better or worse.

4.      Decide which areas you will focus on - I
divide changeover into two broad categories.
"Mechanical" is the modification of machinery and
equipment to ease changeover. "Operational" are
all other functions including material handling,
documentation, quality inspections/line
clearance, package/product design, job
assignments, scheduling. Some of these are
interactive but for the most part they can be
viewed as separate paths. In some plants the big
bottleneck will be operational issues. In others
it will be mechanical. Both need to be addressed
but, depending on the resources available, it may
be best to focus on one or the other at least initially.

5.      Decide who will be on the team -
Especially at the beginning, a primary attribute
of the team members must be enthusiasm. The
selection of team members will depend to some
degree on which path, mechanical or operational,
you will initially concentrate on. One key is
that the team have a leader, what I call a
"Champion" who can preside in an effective
manner. This Champion can be a manager,
supervisor, engineer, mechanic or operator. The
most important qualification, in my view, is a
strong belief in the benefits of reducing
changeover and a desire to succeed. Needless to
say, whoever is selected to be Champion, they
must have strong support from management.

6.      Provide training - The first thing they
need is training. It is not reasonable to simply
expect a team to come together and intuitively
figure out how to reduce changeover times.  This
training must include the basics such as
definitions and must provide a methodology for
looking at changeover and identifying improvement
opportunities. Finally it must provide techniques
to implement those opportunities. Finally, the
training must provide facilitated opportunities
to practice the methodologies and techniques.
NOTE: This is precisely what my "Changeover Made
ESEE" workshop is designed to do. E-mail me at
john@... for more info.

7.      Provide resources - The most important
resource to be provided is time. The team must
have time to meet. Meetings should be regular and
should have an agenda. Other resources include
books, magazines, contacts and even visits with
other similar and dissimilar plants. It goes
without saying that resources must also include
support and funding to implement improvements.

8.      Set goals - If it is not specific, with a
completion deadline, it is not a goal, it is
merely a good intention and we know what road is
paved with those, don't we? A generic goal I
often recommend is a 50% reduction in 6 months.
Milestones along the way are also a good idea.
The problem with continuous or perpetual programs
is that people lose enthusiasm and that without
time pressure of a deadline, some of the sense of
urgency is lost. This does not mean that at the
end of the project you should stop improving.
Simply start another project when the first is
finished. It may have some different people
and/or a different focus. I favor a series of
consecutive, specific, projects rather than the amorphous perpetual project.

9.      Implement the program - As the team
develops improvements, they should be implemented
as soon as possible. One of the things I
recommend is that some very simple, quick (less
than 2 weeks) to implement improvements be
implemented right off the bat. This will instill
an initial sense of success and confidence and
can be built on with more complex improvements.

10.     Expect failures - Babe Ruth, who long
held the baseball homerun record still holds the
strike out record. There will be failures. Do not
let them slow the program. Build on them and learn from mistakes.

11.     Recognize the participants - At the end
of the program, take stock of what has been
accomplished. Was the goal met? Why or why not?
How much benefit has the program been to the
company in dollars? Congratulate the participants
for a job well done (or at least a valiant effort if the goal was not met.)

12.     Go back to step 1 and start all over
again - Your competition is continually getting better. You can't stop now.

Space prevents me from doing much more than
giving a skeleton here. A lot of this is covered
in more detail in an article I wrote a few years
ago for The Journal of Pharmaceutical
Engineering. E-mail john@... if you would like a copy.

TIP OF THE MONTH…

GEORGE STALK

I am currently teaching a graduate course in
Strategic Management and one of the department
assigned readings was a Harvard Business Review
article by George Stalk, Philip Evans and
Lawrence Schulman titled "Competing on
capabilities". It discusses the importance of
eliminating wasted time in business processes,
especially, but not only, in manufacturing. It
distills a lot of things I've seen and read as
well as thought about over the years. This is the
first time I have seen it all so powerfully
written in one place. The article can be downloaded at:
   http://my.execpc.com/~jpurtell/HBR-CompetingonCapabilities.pdf

I would say it is a must read.

Two other articles by Stalk that I highly recommend:
http://www.bcg.com/publications/files/434TheTurnaroundMansLastSpeech.pdf
http://www.forbes.com/global/2004/1018/026_print.html
(The Forbes article is especially useful if your
company does business with Wal-Mart)

On the strength of the article I bought his book
"Competing Against Time" and am about a third of
the way into it. Based on what I see so far,
anyone engaged in manufacturing should read it.



Best,

John R Henry CPP

"All progress is made by a lazy person looking
for an easier way." - Lazarus Long

www.changeover.com www.smedblog.com

Twitter  johnrhenry 787-550-9650

#120 From: John Henry <johnhenry@...>
Date: Mon Apr 27, 2009 6:36 pm
Subject: Lean Changeover Newsletter-April 2009 (Money & Sealed cabinets)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) APRIL 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com
or contact me at <mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

What do you plan to do in 2009 to reduce changeover losses? Is this
the year you are finally going to get serious?

There is no better way to kickstart a changeover program than my
"Changeover made ESEE" workshop. This 2 day workshop is a goldmine of
practical information as well as a hands-on putting the info to work
in your plant.

Call 787-550-9650 or e-mail
<mailto:john%40changeover.com>john@... now to schedule a
session in your plant.

Line downtime costs $0000s/hour. How many dollars can you afford to waste?


Follow me on Twitter at johnrhenry

SOME THOUGHTS ON…
THINK OF IT AS MONEY

Not long ago I was helping a client reduce
changeover times on their tablet presses. These
machines are used to compress a granulated powder
into pharmaceutical tablets. Changeover involves
significant cleanup, change of tooling and then
calibration. Changeover times will vary between
plants and with different styles of machine but
can run from 10-12 hours to 40-48 hours. My
belief is that, properly organized and performed,
it should take in the 8-16 hour range, no longer.

An issue that I have long had with changeover is
getting the people on the floor, the ones
actually doing the work, to get excited about it.
Absent an understanding of the value, many of
them do not overly care whether they are running
product or not. The product is often just an abstraction.

I've written elsewhere about how to calculate the
tangible and intangible costs of changeover so
will not go into hit here. I've written and
spoken on numerous occasions of the critical need
to calculate costs and disseminate them widely
across the workforce. This goes a long way in
explaining changeover's importance but is still
something of an abstraction to many.

It occurred to me that the problem is that people
are not seeing the money coming out of the
machine. One way I hit on recently is to express
the cost of each product instead of cost per
hour. In the case of the tablet press, the
production rate was 3,500 tablets per minute
(TPM) (Some run 4-5 times as fast) I asked the
operators to close their eyes and envision,
instead of tablets, pennies coming out of the machine into a bucket.

By itself, a penny isn't much to look at. A
quantity of pennies can add up to a goodly sum.
If there were 3,500 pennies per minute coming off
the press, that would represent $35/minute,
$2,100/hour or almost $17,000 per shift. If the
tablets are worth more than a penny, as most
pharmaceutical tablets are, those dollar amounts
will increase correspondingly.

Another example would be a packaging line. If
each bottle coming off the line contributes 25
cents, it can be viewed as a torrent of quarters.
If the line speed is 250BPM, it is the equivalent
of over $63/minute, $3,750/hour or $30,000/shift.

If you had a stream of quarters falling into your
pockets like that, you would do as much as
possible to prevent interruptions to the flow.

It is true that the quarters are falling into the
company's, rather than the employee's pockets.
Some employees may take this to mean that they
have no stake in keeping that flow going. They
are looking at it and wondering "WIIFM?" ("What's in it for me?")

What's in it is not always obvious and may need
to be explained. What's in it for them is that
the company which does not make a profit is a
company that will be closing. What's in it is
that the more profit a company makes, the more
they have to share with the employees. This is
directly, via a profit sharing program, in some
cases. It can also be indirectly in the form of
better compensation and more opportunities for
advancement and growth. Sometimes it may be even
more indirect in the form of capital spending on
better plant and equipment. In all cases, there
is benefit to the individual employee. Management
must always be answering that question.

I have read that the phrase "making money" is
unique to the US. Some other languages and
cultures speak of "winning" or "earning" money. I
prefer the phase "making money" because that is
really what a production process does. It makes/creates/produces money.

And when it is stopped, it does not.

So, think of your product as money because it is.


TIP OF THE MONTH…
SEALED CABINETS

Tablet presses are, by their nature, dusty. This
dust gets everywhere and must be cleaned at
changeover. What always catches my eye is how
many areas need to be cleaned that should not be.

The typical tablet press has a lower compartment
where the motor, drive and other components are
located. This is a nuisance to clean as there are
so many places for the dust to collect.

The solution seems fairly simple. Gasket the
doors to the cabinet and add latches so that it
can be sealed. Ideally, it would be nice to have
it comply with the NEMA 4 (dust tight) rating but
this may not be possible. It may always be
necessary to clean inside the cabinet but the
less dust that can get in, the less cleaning will
be required. More importantly, the less downtime
for cleaning will be required.

In addition to sealing the cabinet, you may want
to consider bringing outside ventilation air in.
One way to do this is to take a small flexible
duct off the room A/C system. This not only
provides cooling, which may be restricted by
sealing the cabinet, it also provides a slight
positive pressure to further reduce the dust infiltration.

I gave as an example a tablet press. However, the
above applies to any machine with an enclosed
base or cabinet. It also applies to control
cabinets, light fixtures and equipment chases.

I should not need to say this but experience
shows that I do. Keep the cabinet doors closed
and latched. All the gasketing in the world will
do no good if the doors are left ajar.


Best,

John R Henry CPP

"All progress is made by a lazy person looking
for an easier way." - Lazarus Long

www.changeover.com www.smedblog.com

Twitter  johnrhenry 787-550-9650

#119 From: John Henry <johnhenry@...>
Date: Sat Mar 21, 2009 7:45 pm
Subject: Lean Changeover Newsletter-March 2009 (Circus & Photoeyes)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) MARCH 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
<<http://www.changeover.com>http://www.changeover.com>http://www.changeover.com
or contact me at
<mailto:john%40changeover.com><mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

What do you plan to do in 2009 to reduce changeover losses? Is this
the year you are finally going to get serious?

There is no better way to kickstart a changeover program than my
"Changeover made ESEE" workshop. This 2 day workshop is a goldmine of
practical information as well as a hands-on putting the info to work
in your plant.

Call 787-550-9650 or e-mail
<mailto:john%40changeover.com>john@... NOW to schedule a
session in your plant.

Line downtime costs $0000s/hour. How many dollars can you afford to waste?


SOME THOUGHTS ON...
THE CIRCUS

An expression I have heard from time to time over my life, to
describe something that is chaotic or unorganized is, "Sheesh, what a
circus!" When really chaotoc, it may be referred to as a "3 ring circus"

A couple weeks ago, for the first time in a number of years, I went
with the family to the Barnum & Baily, Ringling Brothers Circus. It
was a pretty good show and I enjoyed the acts. Being as I am, I
enjoyed what took place between the acts as much as the acts
themselves. In some ways a circus is like an orchestral concert. Each
act builds on the previous one and, if there is too much delay
between them, audience attention will be lost. So, when the dog act
finishes, the equipment for the acrobatic act must be moved into the
ring. (This was a one ring circus). This must happen quickly and
smoothly in the open for all the audience to see.

Watching this got me thinking, as so many things do, about changeover
and the lessons we can learn just by keeping our eyes open. Many of
the folks at the circus are professionals but I suspect that a number
of them are hired locally as temporary laborers. This means that the
day before the circus they have no idea what they are to do and there
is little or no time to provide much more than very minimal training.
In order to accomplish the tasks as effortlessly as they made them
appear, there must be a very good underlying system in place.

Safety has to be a prime concern as well. There was a tiger act for
which they set up a large portable cage. This cage is designed for
rapid erection and teardown but it still must be done perfectly. Had
one of the cage panels not been fastened securely, it might have been
possible for a tiger to get loose. Even if the tiger itself had not
been a threat, the panic in the stadium could have caused injury or
death in the audience. The framework and rigging for the acrobatic
apparatus must be perfectly set up or injury to one of the performers
could result.

Finally, at the end of the show, the last performers had barely
exited the ring and the stagehands were already disassembling the
show. It probably looked a bit chaotic to the untrained eye. When I
looked at it, I could see that it was carefully choreographed.
Everybody had a task, they were going about it purposely and in what
seemed like a logical order. They had large, wheeled, boxes into
which everything went. The boxes were clearly marked with large
numbers and identification. By the time the audience got out of the
coliseum, they already had the show torn halfway down. I was
seriously impressed.

So what kind of circus are you running in your plant? When you do
changeovers are they like the circus I saw recently or the
hypothetical "Sheesh, what a circus!" one? If the latter, what are
you doing to make it look more like the former?

(If you want some ideas how to make your changeovers more like
circuses, call me at 787-550-9650 or e-mail john@...)

TIP OF THE MONTH...
PHOTOEYES

I have done a lot of work with all types, brands and applications of
photoeyes for the past 35 years. For most of theat time, I have been
a fan of Tri-Tronics brand photoeyes  and would never willingly use
any other brand where I have a choice. The main thing I like, besides
the quality and variety of the eyes is that they have 10 LEDs. The
typical photoeye has a single LED which indicates whether or not it
is activated but not how strong or weak the signal is. On a
Tri-Tronics eye 1 lit LED indicates a weak signal, 10 a strong one
with the eye switching at about 5. This feature makes it very fast
and easy to manually set up the eye. To make things even easier, they
also have a single pushbutton that automatically sets the sensitivity.

Another device I really like are their Multi-Mate & PIC programmable
relays. With this relay, 2 photoeyes, an enclosure and a few other
parts, it is easy to make a rock solid reliable inspection system for
under $500. I have built systems to look for things such as missing
or wrong color caps, label presence, open flaps and other defects. A
particularly nice feature is that it allows for fail-safe design. It
can (and normally should) be set up to reject every product with a
slight time delay. Once the desired condition has been verified, it
cancels the reject for non-defective products.

I've saved the best for last:

Last week I had a chance to visit their factory where they showed me
their new Smarteye XPC photoeye with RS-485/232 connection. This
allows the eye to be integrated with any control system but has the
additional benefit of providing an on-screen view of the eye on the
HMI. Thus, it is possible to view a graphic of the eye, click on the
various buttons to set or adjust it. It also provides a graph
display, akin to an oscilloscope to monitor eye performance.

Check out the Tri-Tronics website at www.ttco.com



Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way." -
Lazarus Long

#118 From: John Henry <johnhenry@...>
Date: Fri Feb 20, 2009 2:35 pm
Subject: Lean Changeover Newsletter-February 2009 (OEE & OEE Resources)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) FEBRUARY 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
<http://www.changeover.com>http://www.changeover.com or contact me at
<mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

What do you plan to do in 2009 to reduce changeover losses? Is this
the year you are finally going to get serious?

There is no better way to kickstart a changeover program than my
"Changeover made ESEE" workshop. This 2 day workshop is a goldmine of
practical information as well as a hands-on putting the info to work
in your plant.

Call 787-550-9650 or e-mail john@... NOW to schedule a
session in your plant.

Line downtime costs $0000s/hour. How many dollars can you afford to waste?


IOPP PACKAGING MACHINERY COURSE: Don't forget that next month I will
be teaching the IOPP packaging machinery course in Chicago. There are
still a few (very few!) seats open. If you want to learn the basics
about a wide range of packaging machinery, sign up now. Frain
Industries www.fraingroup.com is providing the venue as well as
actual machinery for some hands on experience.

For more information visit:

http://www.iopp.org/i4a/pages/index.cfm?pageid=1373

If you have any questions, feel free to drop me a note at john@...

SOME THOUGHTS ON...

OEE

OEE is a term that has been on many lips in the past year or two. It
stands for, depending on who you listen to, "Overall Equipment
Effectiveness" or "Overall Equipment Efficiency". I used the
scientific method to settle it. I went to Google. Based on number of
hits for each phrase, Effectiveness seems to be the more popular
term. I think this is appropriate as manufacturing is more about
being effective, defined as doing the right thing than efficient,
doing things right. That is, if you are making the product that your
customer wants, you are being effective. If you are making it well,
obtaining a high proportion of output to input, you are doing it efficiently.

OEE is a useful tool because it gives a single number by which to
monitor line performance. If this number of calculated uniformly, it
can be used to compare the performance of differing lines and
processes. It would be nice if there were a single agreed standard
for OEE and therein lies the danger of relying excessively on it.
Many companies use it but each seems to want to put its own twist on
how they define and measure the various components. With OEE as with
any other term, it is more important that everyone in an organization
use the same definitions than what those definitions are.

So what is OEE?

OEE is composed of 3 metrics: Availability, Performance and Quality.
Each measures a different aspect of an operation. The percentage
number associated with each can be useful in improving performance.
OEE is the product of Availability X Performance X Quality and is
expressed as a percentage.

OEE availability is the percentage of time spent producing relative
to the scheduled available time. A plant running a single shift (480
minutes) operation might schedule 60 minutes for meals and breaks.
Theoretical availability is thus 420 minutes. If the line normally
shuts down during these breaks, availability should not be penalized.
If it normally continues running, perhaps using relief workers, but
due to absences on a particular day needs to stop, this lost time
will count against availability. As an example, assume that on a
given day downtime from various causes such as cleanup and setup,
lack of materials or documentation or plant meetings, is 50 minutes.
Total availability is 420-50 or 370 minutes. OEE availability is
370/420 or 88%.

OEE performance is the actual running speed relative to the
theoretical running speed. This is generally the manufacturer's rated
speed. A standard line speed of 200PPM, over the 370 minutes
available, should produce a total of 74,000 units. If it produces
68,000 units over the shift, its OEE performance is 92%. Note that
this is total production of both good and rejected products, not just
good production.

Performance is affected by minor stoppages, typically less than a
minute or two. Typical stoppages will include clearing machine jams
or the need to make minor adjustments. In some cases it may be
necessary to run a line more slowly than normal due to marginal
components or product.

Quality must be factored in because, at the end of the day, what is
really important is not total production but total good production.
OEE Quality is the percentage of good production relative to total
production. If total production was 68,000 units but 1,000 were
rejected, the quality metric is 68,000 divided by 67,000 or 98%. A
reject under OEE is defined as any product that does not make it
through the process on the first pass. Products that are reworked or
products that are rejected in error and later accepted are still
treated as rejects under OEE.
Our hypothetical line thus has an overall OEE of:
0.88(availability) X 0.92(performance) X 0.98(quality) = 0.79 = 79%

OEE is an excellent tool since it provides a single number by which
to monitor line performance. By its nature, it allows comparison
across different lines or processes within a plant or even between
plants in the same company. It should allow comparison between plants
of different companies or even industries. A problem is that there is
not a single agreed upon standard. Different companies will each put
their own twist on how they calculate OEE. When this happens,
comparisons become meaningless. In other words, when comparing OEE
between companies, or even within the same company, be sure that it
is calculated using the same methodology. If not, it is apples and
oranges and comparisons are meaningless.

TIP OF THE MONTH

OEE RESOURCE

If you are into or getting into OEE, Vorne Industries has several
tools that are very helpful. Most important is their "Fast Guide to
OEE". This is a 27 page tutorial on OEE that makes an excellent
starting point for those wanting to learn more. They also publish an
Excel template that, upon plugging in your data, will automatically
calculate OEE. Vorne also manufactures OEE monitors that display OEE,
its 3 components as well as other metrics in real time. For more
information, visit their site at www.oee.com Tell them John Henry sent you.



Best,

John R Henry CPP
www.changeover.com
787-550-9650
"All progress is made by a lazy person looking for an easier way." -
Lazarus Long
Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way." -
Lazarus Long

#117 From: John R Henry <johnhenry@...>
Date: Thu Jan 22, 2009 12:44 pm
Subject: Lean Changeover Newsletter-January 2009 (SMED-Ladders)
johnrhenrypr
Offline Offline
Send Email Send Email
 
My apologies if you are getting this a second time.

(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) JANUARY 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
<http://www.changeover.com>http://www.changeover.com
or contact me at <mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

What do you plan to do in 2009 to reduce
changeover losses? Is this the year you are finally going to get serious?

There is no better way to kickstart a changeover
program than my "Changeover made ESEE" workshop.
This 2 day workshop is a goldmine of practical
information as well as a hands-on putting the info to work in your plant.

Call 787-550-9650 or e-mail john@...
NOW to schedule a session in your plant.

Line downtime costs $0000s/hour. How many dollars can you afford to waste?


InterPhex Puerto Rico is next Thursday and Friday
(1/29 & 30) If you are there Friday, I’ll be
around and would be happy to buy you a cup of
coffee. Call my cell (787-550-9650) Even better,
come hear me on Friday. I will be presenting a
talk on “Optimizing Throughput: High Speed
Packaging Lines Updates and Case Studies” . You
can find more info at
<http://www.interphexpuertorico.com/>www.interphexpuertorico.com
Click on the “conferences” link in the left sidebar.



SOME THOUGHTS ON…
SMED

In the 1960’s Toyota Motors had a problem. They
made inexpensive cars for the mass market. Costs
were kept down by limiting variety of models and
styles. This was in keeping with their guru,
Henry Ford’s, philosophy of avoiding changeover.
The market was changing and customers demanded
cars that better fit their individual needs and
tastes. Toyota realized that they needed to find
a way to satisfy these wants while, at the same time, keeping costs down.

Shigeo Shingo was a consulting industrial
engineer and Toyota brought him in to solve this
apparent conundrum. The initial assignment was to
reduce the time it took to change the dies in
stamping presses. When he began the project,
changeovers took 10-12 hours. When he finally
finished, several phases and years later, die
changeovers took under 10 minutes. Shingo did
nothing magic, he simply applied fairly standard
techniques that are in every industrial
engineer’s toolbox. It has always seemed to me
that Shingo’s big breakthrough was his
application of these tools to changeover.

Shingo did what any good IE would do, he observed
the process to see where time was being lost. One
key area was standardization of external die
dimensions. Each die was a different size,
depending on its purpose. This necessitated
adjustment of the press shut height, mountings
and more. Shingo standardized external die sizes
by adding shims and spacers, permanently mounted
to the dies. Now, there was no adjustment
required to the press. One die was removed and
the next slipped into its place.

That, by itself, would result in considerable
savings. But that was not all that improved.
Since the dies were the same, the mounting bolts
were the same. Previous practice had wasted a lot
of time looking for the correct mounting bolts
for each die size. Standardizing the size
eliminated the need for different bolts.
Adjustments to the press required a high level of
skill and brought risk of damage if not done
correctly. Elimination of adjustment allowed less
skilled (and more available) workers to perform
the changeover while reducing risk of damage.

Standard die sizes also facilitated specialized
handling systems to manage the heavy dies, saving even more time.

One of the things that amazes me is that this
idea now seems so obvious that I have trouble
understanding why it was not seen earlier. What
amazes me even more is that I go into plants
today that have different size dies, molds and other changeable parts.

A second big breakthrough by Shingo was the
concept of externalization. When he started the
project, the mechanic would typically stop the
press and only then go to fetch the dies and
other parts required for the next part to be
made. Shingo realized that this could be done
ahead of time, while the press was still running.
This concept of externalization says that to the
maximum extent possible, all changeover tasks
should be done either before machine stops or
after it restarts. In other words “external” to
the downtime. This is also such a simple and
obvious concept that I am amazed on a daily basis
that it is not more widely practiced.

Shingo developed his ideas into a system that he
called SMED for Single Minute Exchange of Dies.
One misconception is that by “single minute” he
meant under 1 minute. As he explains in his book
“A Revolution In Manufacturing: The SMED System”,
he meant single digits of minutes or under 10 minutes.

I take my hat off to Shingo in admiration. He
truly showed the way to a revolution in
manufacturing by treating changeover as a
solvable problem rather than a necessary evil
that must be accepted. His techniques are simple
in concept yet universally applicable. Most of
all, I thank him for sharing the ideas with us
rather than keeping them locked up as proprietary company information.

Having said all this, I do think that there is
one area that is neglected in the book. This may
be because it was not an issue at Toyota at the
time but it is am important issue in virtually
every company I have ever worked with.
Changeover, properly defined, addresses the total
process of getting from product A to product B. A
program to reduce changeover must address the
physical changeover of the machinery, of course,
and this was Shingo’s main focus. Equally
important, in some cases even more critical, are
operational issues. It does no good to reduce
changeover time from 4 to 1 hours if it still
takes 3 hours for the warehouse to issue the
materials. Much of my practice is in the
pharmaceutical industry and I see a lot of time
lost where the line is ready to run but the
documentation to run the next lot is not yet available.

I teach that there are two paths to lean
changeover, one mechanical, the other
operational. Focusing on only one or the other
will seldom yield the results you need.

“A Revolution in Manufacturing: The SMED System”
is a wonderful book. Anyone involved in any
manufacturing process should read and study it.
It was written for heavy, metal bending,
processes and some people fail to see the
applicability to lighter processes such as
packaging, plastic molding or assembly. This is a
mistake for it is the concepts more than the
examples that are the key and the concepts are universally applicable.

The book is available from Productivity Press at
<http://www.productivitypress.com/>www.productivitypress.com
A companion book, “Quick Changeover for
Operators” is part of their Shop Floor series.
This is a simplified version of Shingo’s book and
is an excellent introduction for operators,
mechanics, technicians and others who want to
learn the basics of the SMED system.

TIP OF THE MONTH…
INTERNAL LADDERS

Time is often lost looking for ladders to access
the access points on top of machines. Even worse,
time is not looking for ladders and people will
stand on chairs, pipes or other convenient
objects creating an unsafe condition.

Steps, stairs and ladders can be built right into
machines as needed to assure that they are always
available. For example, a small (12” X 18”)
platform might be mounted 18” off the floor to
stand on. This can be hinged so that it folds out
of the way when not in use. Another alternative I
have seen is to weld crossmembers to a machine frame forming a ladder.

Note that while these are intended to avoid a
safety hazard, they can create a hazard
themselves if not properly designed. If going
this route, be sure to consult with your safety gurus.

Also, I probably should not need to say this but
experience shows me that I do. Be sure to use
non-skid surfaces on any ladders or steps.


Best,

John R Henry CPP
www.changeover.com
787-550-9650
"All progress is made by a lazy person looking
for an easier way." - Lazarus Long
Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking
for an easier way." - Lazarus Long

#116 From: John R Henry <johnhenry@...>
Date: Wed Jan 21, 2009 7:32 pm
Subject: Lean Changeover Newsletter-January 2009 (SMED-Ladders)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) JANUARY 2009
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
<http://www.changeover.com>http://www.changeover.com
or contact me at <mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

What do you plan to do in 2009 to reduce
changeover losses? Is this the year you are finally going to get serious?

There is no better way to kickstart a changeover
program than my "Changeover made ESEE" workshop.
This 2 day workshop is a goldmine of practical
information as well as a hands-on putting the info to work in your plant.

Call 787-550-9650 or e-mail john@...
NOW to schedule a session in your plant.

Line downtime costs $0000s/hour. How many dollars can you afford to waste?


InterPhex Puerto Rico is next Thursday and Friday
(1/29 & 30) If you are there Friday, I’ll be
around and would be happy to buy you a cup of
coffee. Call my cell (787-550-9650) Even better,
come hear me on Friday. I will be presenting a
talk on “Optimizing Throughput: High Speed
Packaging Lines Updates and Case Studies” . You
can find more info at
<http://www.interphexpuertorico.com/>www.interphexpuertorico.com
Click on the “conferences” link in the left sidebar.



SOME THOUGHTS ON…
SMED

In the 1960’s Toyota Motors had a problem. They
made inexpensive cars for the mass market. Costs
were kept down by limiting variety of models and
styles. This was in keeping with their guru,
Henry Ford’s, philosophy of avoiding changeover.
The market was changing and customers demanded
cars that better fit their individual needs and
tastes. Toyota realized that they needed to find
a way to satisfy these wants while, at the same time, keeping costs down.

Shigeo Shingo was a consulting industrial
engineer and Toyota brought him in to solve this
apparent conundrum. The initial assignment was to
reduce the time it took to change the dies in
stamping presses. When he began the project,
changeovers took 10-12 hours. When he finally
finished, several phases and years later, die
changeovers took under 10 minutes. Shingo did
nothing magic, he simply applied fairly standard
techniques that are in every industrial
engineer’s toolbox. It has always seemed to me
that Shingo’s big breakthrough was his
application of these tools to changeover.

Shingo did what any good IE would do, he observed
the process to see where time was being lost. One
key area was standardization of external die
dimensions. Each die was a different size,
depending on its purpose. This necessitated
adjustment of the press shut height, mountings
and more. Shingo standardized external die sizes
by adding shims and spacers, permanently mounted
to the dies. Now, there was no adjustment
required to the press. One die was removed and
the next slipped into its place.

That, by itself, would result in considerable
savings. But that was not all that improved.
Since the dies were the same, the mounting bolts
were the same. Previous practice had wasted a lot
of time looking for the correct mounting bolts
for each die size. Standardizing the size
eliminated the need for different bolts.
Adjustments to the press required a high level of
skill and brought risk of damage if not done
correctly. Elimination of adjustment allowed less
skilled (and more available) workers to perform
the changeover while reducing risk of damage.

Standard die sizes also facilitated specialized
handling systems to manage the heavy dies, saving even more time.

One of the things that amazes me is that this
idea now seems so obvious that I have trouble
understanding why it was not seen earlier. What
amazes me even more is that I go into plants
today that have different size dies, molds and other changeable parts.

A second big breakthrough by Shingo was the
concept of externalization. When he started the
project, the mechanic would typically stop the
press and only then go to fetch the dies and
other parts required for the next part to be
made. Shingo realized that this could be done
ahead of time, while the press was still running.
This concept of externalization says that to the
maximum extent possible, all changeover tasks
should be done either before machine stops or
after it restarts. In other words “external” to
the downtime. This is also such a simple and
obvious concept that I am amazed on a daily basis
that it is not more widely practiced.

Shingo developed his ideas into a system that he
called SMED for Single Minute Exchange of Dies.
One misconception is that by “single minute” he
meant under 1 minute. As he explains in his book
“A Revolution In Manufacturing: The SMED System”,
he meant single digits of minutes or under 10 minutes.

I take my hat off to Shingo in admiration. He
truly showed the way to a revolution in
manufacturing by treating changeover as a
solvable problem rather than a necessary evil
that must be accepted. His techniques are simple
in concept yet universally applicable. Most of
all, I thank him for sharing the ideas with us
rather than keeping them locked up as proprietary company information.

Having said all this, I do think that there is
one area that is neglected in the book. This may
be because it was not an issue at Toyota at the
time but it is am important issue in virtually
every company I have ever worked with.
Changeover, properly defined, addresses the total
process of getting from product A to product B. A
program to reduce changeover must address the
physical changeover of the machinery, of course,
and this was Shingo’s main focus. Equally
important, in some cases even more critical, are
operational issues. It does no good to reduce
changeover time from 4 to 1 hours if it still
takes 3 hours for the warehouse to issue the
materials. Much of my practice is in the
pharmaceutical industry and I see a lot of time
lost where the line is ready to run but the
documentation to run the next lot is not yet available.

I teach that there are two paths to lean
changeover, one mechanical, the other
operational. Focusing on only one or the other
will seldom yield the results you need.

“A Revolution in Manufacturing: The SMED System”
is a wonderful book. Anyone involved in any
manufacturing process should read and study it.
It was written for heavy, metal bending,
processes and some people fail to see the
applicability to lighter processes such as
packaging, plastic molding or assembly. This is a
mistake for it is the concepts more than the
examples that are the key and the concepts are universally applicable.

The book is available from Productivity Press at
<http://www.productivitypress.com/>www.productivitypress.com
A companion book, “Quick Changeover for
Operators” is part of their Shop Floor series.
This is a simplified version of Shingo’s book and
is an excellent introduction for operators,
mechanics, technicians and others who want to
learn the basics of the SMED system.

TIP OF THE MONTH…
INTERNAL LADDERS

Time is often lost looking for ladders to access
the access points on top of machines. Even worse,
time is not looking for ladders and people will
stand on chairs, pipes or other convenient
objects creating an unsafe condition.

Steps, stairs and ladders can be built right into
machines as needed to assure that they are always
available. For example, a small (12” X 18”)
platform might be mounted 18” off the floor to
stand on. This can be hinged so that it folds out
of the way when not in use. Another alternative I
have seen is to weld crossmembers to a machine frame forming a ladder.

Note that while these are intended to avoid a
safety hazard, they can create a hazard
themselves if not properly designed. If going
this route, be sure to consult with your safety gurus.

Also, I probably should not need to say this but
experience shows me that I do. Be sure to use
non-skid surfaces on any ladders or steps.


Best,

John R Henry CPP
www.changeover.com
787-550-9650
"All progress is made by a lazy person looking
for an easier way." - Lazarus Long
Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking
for an easier way." - Lazarus Long

#115 From: John R Henry <johnhenry@...>
Date: Sun Dec 21, 2008 10:19 pm
Subject: Lean Changeover Newsletter-December 2008 (Books-Transom)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) DECEMBER 2008
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
<http://www.changeover.com>http://www.changeover.com or contact me at
<mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested
=============================================================

What do you plan to do in 2009 to reduce changeover losses? Is this
the year you are finally going to get serious?

There is no better way to kickstart a changeover program than my
"Changeover made ESEE" workshop. This 2 day workshop is a goldmine of
practical information as well as a hands-on putting the info to work
in your plant.

Call 787-550-9650 or e-mail john@... NOW to schedule a
session in your plant.

Line downtime costs $0000s/hour. How many dollars can you afford to waste?


SOME THOUGHTS ON...
BOOKS

Marx said "Outside of a dog books are man's best friend. Inside of a
dog it is too dark to read anyway."

Just to be clear, that was Groucho, not Karl, Marx.

I've been an avid reader all my life. I probably read about 50-60
books a year on a variety of topics. Some fiction and lots of
non-fiction including technology, history, bios, management and more.
There are very few books, perhaps none, that I have failed to learn
from. Some of this has been useful to my professional interests. Some
of it has been merely interesting. However, I tend to have a brain
like an attic with all sorts of apparently useless information
squirreled away. Every once in a while, and not such long whiles
either, I will be involved in a project, sitting in a meeting or some
other venue trying to figure out what to do and one of these ideas
will pop out. It turns out that it was not so useless after all!

Someone once said that it is not reasonable to expect a book to teach
you something on every page. Some do but they tend to be very few.
That same person also said that if you learn one new idea or way of
thinking about something, the investment in reading time has been amply repaid.

I was reminded while spending a week in a client's plant. Actually,
in the past month I've spent a week in each of 4 of the client's
plants. One of the things I noticed in 2 of the plants  was that a
lot of people seemed to have books on their desks that they would
carry with them when going on break. In the break room, I would
usually see 3-5 people sitting reading while drinking their coffee of
eating their lunch. Nothing earthshaking in the way of reading
material. It was not like they were poring over technical manuals or the like.

I got to talking to one of the women reading and asked why it seemed
more prevalent in these plants than others I have been in. She took
me over to the corner of the break room and showed me a bookshelf.
The company had provided the bookshelf and employees had stocked it
with books from home. Nobody manages it, ideally, if you take a book
you are supposed to leave one but then some people leave extras so if
a book or two goes missing it is no big deal.

There was also a fair selection of magazines on a variety of subjects
that people had brought in.

And all the company did was provide a bookshelf. Seems like a pretty
cheap price to pay to get employees to read. Maybe it is something
you'd like to try in your plant?

Now let me anticipate an objection:

If employees are reading in the lunchroom, they are not taking this
opportunity to socialize with their peers. That is true and, if the
reading were carried to an extreme, it might (emphasize "might") be a
bit of a bad thing. On the other hand, we spend all our day talking
to our co-workers and sometimes just want a bit of piece and quiet.
While I understand the concern and agree that it could be a problem,
my thinking is that it probably is not.

So, do you like to read? If you are reading this newsletter, you are
probably interested in reading about changeover. There is not a lot
written specifically about it but here are a few books that you
should find interesting and useful:

How about some feedback? What books do you recommend on changeover,
lean manufacturing and other related areas? Send them to me and in a
future newsletter I will post a list. Let me know if I can use your
name or not. My default is not to use it but I do like to give credit
where due.

BOOKS

"A Revolution in Manufacturing: The SMED System" by Shigeo Shingo,
www.productivitypress.com

This is THE book to read on changeover. Also see Productivity Press's
"Quick Changeover for Operators" This doesn't have any additional
information but is a simplified summary of the SMED book and very
useful for people who don't want to get deeply into the nuts and bolts of it.


"Kaizen for Quick Changeover: Going Beyond SMED"-Kenichi Sekine and
Keisuke Arai, 1992 www.productivitypress.com

This book discusses ways of improving changeover processes with lots
of illustrations and practical tips. It also discusses costs of changeover.


"Improving Changeover Performance"-S. Culley, A. Mileham, R. McIntosh, G. Owen
www.amazon.com

There are not many books dealing specifically with changeover in
packaging, printing or other smaller scale production processes. This
is far and away the best.


"The Visual Factory: Building Participation through Shared
Information"-Michel Greif, 1991 www.productivitypress.com

This book is about how to present information and physically organize
a manufacturing plant. A lot of the information can be used to help
make documentation of changeovers and procedures more readily
available and user friendly.


"Set-Up Time Reduction"-Jerry W. Claunch, www.amazon.com

This is an excellent book specifically about reducing setup times. It
take a holistic approach and covers a number of areas. You can learn
a lot from it.

"PI: How to Optimize Packaging Line Performance"-Paul J. Zepf, CPP,
1996, Institute of Packaging Professionals http://www.iopp.org/bookstore

This book deals specifically with packaging lines and covers a lot of
ground on how to optimize performance in a number of areas. One key
area, too often ignored, is actually measuring performance. There is
an excellent chapter on "Quick Change Process (QCP)"

"Safer Than A Known Way"-John S. McConnell

This is not one of the best books on the subject I have ever read.

It is THE best book I have ever read on the concept of quality. It
completely changed my thinking. It is a bit hard to find but well
worth the effort to search out a used copy.

And, for the grand finale, nobody interested in manufacturing can
afford to pass up Henry Ford's bio "My Life and Work". This book
tells how to design and operate an efficient company. You will find
almost nothing in the Toyota Production System that Henry Ford had
not thought of first. Hopefully Ford will go back to their roots to
get though the current problems they are having.

Buy it in a nice paperback edition with my intro at:
https://www2.xlibris.com/bookstore/bookdisplay.asp?bookid=32476

Or download for free at:
http://www.gutenberg.org/etext/7213


TIP OF THE MONTH
REMOVABLE TRANSOMS

I was recently in a plant and noticed that the transoms over the
doors in the manufacturing area were considerably bigger than I was
used to. The doors were either single or double from about 36 to 72"
wide and probably 80 or 96" high. The transoms over the doors
extended another 4-6 feet. I commented on this and was told that they
were removable. When equipment needs to be moved into or out of the
room, the transom panel and cross piece can be removed with a few
screws. This provides additional access height on an as needed basis.

I thought it was a pretty neat idea.


For a free subscription send a blank e-mail to:
<mailto:quickchangeover-subscribe%40yahoogroups.com>quickchangeover-subscribe@ya\
hoogroups.com

To unsubscribe send a blank e-mail to:
<mailto:quickchangeover-unsubscribe%40yahoogroups.com>quickchangeover-unsubscrib\
e@yahoogroups.com




Best,

John R Henry CPP
www.changeover.com
787-550-9650
"All progress is made by a lazy person looking for an easier way." -
Lazarus Long

#114 From: John R Henry <johnhenry@...>
Date: Fri Nov 28, 2008 12:15 am
Subject: Lean Changeover Newsletter-November 2008 (WIIFM-Swiffer)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) NOVEMBER 2008
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com><mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
<<http://www.changeover.com>http://www.changeover.com>http://www.changeover.com
or contact me at
<mailto:john%40changeover.com><mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
<mailto:quickchangeover-subscribe%40yahoogroups.com><mailto:quickchangeover-subs\
cribe%40yahoogroups.com>quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
<mailto:quickchangeover-unsubscribe%40yahoogroups.com><mailto:quickchangeover-un\
subscribe%40yahoogroups.com>quickchangeover-unsubscribe@yahoogroups.com

=============================================================

Are you seriously interested in reducing your
changeover downtime? If you are, you need a
program and there is no better way to kickstart a
changeover improvement program than my
"Changeover made ESEE" workshop. This workshop is
2 days of useful information, ideas that have
worked and how to apply them in your plant.

To schedule a session in your plant or for more
information call (787-550-9650) or e-mail
(john@...) John Henry today.


SOME THOUGHTS ON…
WIIFM?

An issue with any changeover program is
motivation. How do you get the troops fired up?
Everybody knows what is in it for the company:
more money! What is in it for the people who will
do the actual grunt work of implementation.

One might argue that since they are getting paid,
they should do what they are told to do. There is
certainly truth to that and, if you tell them to
implement a changeover program, they will
probably do it. They may be somewhat grudging.
After all, they are being asked to do something
new. The mere need to change from the old and
accustomed ways makes some people uncomfortable.

What is needed is not grudging obedience to
orders but enthusiastic buy-in and participation.
These people on the line are the true experts on
how the line works and how to improve it. No
company can afford to ignore this knowledge.

One secret is to look at them and imagine,
tattooed on their foreheads the letters WIIFM.
This stands for "What's in it for me?". They need
to see the benefits to them, personally, rather than just to the company.

There are 4 main answers to the WIIFM question:

1)      The most stressful part of their job is
going to be dealing with a machine that does not
run smoothly. One of the reasons machines do not
run smoothly is because they have been improperly
cleaned, set up and/or maintained. Improving
changeover by eliminating, simplifying,
externalizing, and setting exactly (the ESEE
method) will result in smoother running
machinery. Reducing the time spent on changeover
will free up more time for preventive/predictive
maintenance. It will also free up time for more
permanent repairs. Too many times I see
"temporary" repair made to a machine to get the
production run finished. A year later, the same
temporary repair still in place.
2)      Routine, repetitive work is boring.
Involving the floor personnel in developing and
implementing changeover improvements gives them a
change from the routine. It allows them to use
the creativity which we all have within us.
Allowing them to use their creativity will
demonstrate their value to the company as well as
provide the sense of challenge and accomplishment we all need.
3)      As they demonstrate their value to the
company by learning new things and developing new
methods, it is possible that this value will be
recognized by promotion or increased pay.
4)      It is only through profits that a company
is able to pay employees. A company that does not
make profits will not be able to provide the
stability and job security that everyone wants.
Nor will it be able to provide improved pay and benefits.

Caveat: I certainly have no problem mentioning
3&4 to the floor employees. However, care must be
taken in how these are expressed. Be very careful
not to make what might be construed as a promise
of job security or improved pay.

Mechanics and technicians will often feel that
lean changeover will put them out of a job. That
is certainly the goal!. Not to put them out of
the company, of course. Lean changeover will free
them from much of the drudgery of routine work
and allow them to focus their talents in more
valuable ways. These include correct repairs to
machines rather than "temporary" quick fixes,
time to get to the root cause of problems and fix
them rather than just treating the symptoms. Less
time spent on changeover means more time
available to develop and implement other
improvements. It also gives them time to learn
new skills and technologies. All of these make
them more, not less valuable to the company.

One final thought in closing: People will often
worry that lean changeover is just a scheme to
reduce headcount. This may be true but it is
important that the reduced headcount come via
natural attrition ie; not replacing someone when
they leave, rather than layoffs. It is critical
that people not get the sense that they are working themselves out of a job.

A lean changeover program will succeed or fail in
large part by the amount of buy in by the people
being asked to implement it. It is not enough for
them to know what is in it for the company,
important as that knowledge is. They must be shown what is in it for them.

TIP OF THE MONTH…
SWIFFER

I am a big believer in taking any useful
technology wherever I find it. Everybody here has
probably seen Proctor & Gamble's Swiffer line of
cleaning products on the TV. These are basically
dust mops. Instead of the typical dust mop which
has a head that is difficult to clean, these have
a plastic head to which is mounted a disposable
paper duster. A big advantage to this,
particularly in a pharmaceutical plant is that it
eliminate the possibility of cross contamination
that may occur when a dust mop used to clean
after one product is also used after a different one.

They are very light weight with extendable
aluminum handles. This makes them useful for
cleaning walls, ceilings, windows and other
surfaces as well. They can be used wet or dry and
some models even come with fittings to attach spray cans of cleaner.

You can find out more at www.swiffer.com

If anyone from P&G is reading this, I do have one
objection and that is the size. The mop heads
seem to be available in a maximum 18" wide. While
this may be fine for residential use, a wider
(30-42") head would be more useful in industrial
environments. This would allow fewer passes to be
made to clean a given area. Swiffer is a great
product and works well. It just needs this one
tweak to make it a powerful industrial tool.

On the other hand, if there is a wide Swiffer
available, could someone let me know? I've looked and can't find it.




Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking
for an easier way." - Lazarus Long

#113 From: John R Henry <johnhenry@...>
Date: Tue Oct 21, 2008 11:27 pm
Subject: Lean Changeover Newsletter-October 2008 (Process/project-Tool changers)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) OCTOBER 2008
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
<http://www.changeover.com>http://www.changeover.com or contact me at
<mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
<mailto:quickchangeover-subscribe%40yahoogroups.com>quickchangeover-subscribe@ya\
hoogroups.com

To unsubscribe send a blank e-mail to:
<mailto:quickchangeover-unsubscribe%40yahoogroups.com>quickchangeover-unsubscrib\
e@yahoogroups.com

=============================================================

SOME THOUGHTS ON...
CONTINUOUS IMPROVEMENT OR SEQUENTIAL PROJECTS?

Should changeover improvement be a continuous, ongoing program or a
series of programs with fixed goals and timelines? Or, put another
way, should it be a process or a project?

Both approaches have their merits and demerits.

Many programs such as TQM stress the need for "continuous
improvement". That is, once we started, they can never stop. In
theory, I concur 100%. It is only by continuously striving to improve
our processes that we can keep ahead of our competitors.

On the other hand, I have been around long enough to see a number of
these programs implemented. (Anyone remember "quality circles" from
the 70's?) Each one seems to be introduced as the solution to all
ills and as the last new program to be introduced. "This will solve
all of our problems and we will live by it forever."

Until next year.

Then a new program comes along and the whole cycle begins again.
There is even an acronym for this phenomena, "TYNT" for "This Year's
New Thing". Needless to say, as people go through several of these
programs their level of skepticism increases and enthusiasm wanes.

Another problem is that, even in the best of programs, people who
were very interested and motivated at their inception get bored and
stale or develop other priorities and the program just sort of peters out.

+++++++++++++++++++++++++++++++++++++++++++++++++++++++

Do you want to learn how to make your changeovers ESEE?

My Changeover Made ESEE workshop, presented in your plant will teach
your team how. The workshop combines theory, a changeover simulator
as well as practice. For detailed information e-mail
john@... or call me at 787-550-9650 during eastern US
business hours.

+++++++++++++++++++++++++++++++++++++++++++++++++++++++

When they work, and they sometimes do, continuous improvement
programs are great. Too often they fail, in part due to the reasons I
mentioned above.

There is an alternative approach. That is to look at changeover
improvement as a series of discrete projects. Prior to initiating the
project, specific goals, team members, responsibilities and a
timeline are established. In most plants a reasonable goal is 6/50.
That is, in 6 months changeover time will be reduced by 50%. The goal
should go beyond time savings. It will need to be converted to dollar
savings so everyone can see the impact. This dollar/hour number needs
to come from accounting so that it will be universally accepted. Many
will be surprised by the magnitude of the savings. Five thousand
dollars an hour is a fairly low cost for packaging line downtime.
Save five minutes ($416) per day and this adds up to $100,000/yr.

There are a couple of advantages to this approach:

People respond better when they can see a fixed and measurable goal.
If 50% reduction has been established at the goal, it is easy to see
if it has been met. Further, it is fairly easy to see, on a week by
week basis, progress toward meeting the goal.

Once the goal has been set, it is possible to determine what
resources will be required to meet it. In a continuous program, with
no specific goal, it may hard to justify the diversion of resources.
The team winds up simply trying to do the best they can with the
resources they can come up with.

In different phases of changeover improvement, different people may
need to be involved. For example, the first time this is done this,
there will be a lot of relatively easy and simple opportunities.
These will include such things as eliminating tools, simplifying
adjustments, developing or improving procedures etc. In other words,
things that can be done primarily by the people on the line.

Once the easy things have been done, the team needs to move on to
other areas. For example, machinery design might be an issue. This
might involve modifying or replacing equipment. This would require a
higher level focus, probably at the engineering department level. Or
perhaps the product design presents opportunities for improvement. In
this case the marketing or package engineering department might play
the primary role.

At the conclusion of the project, the team responsible can be
positively rewarded for their contributions toward meeting the goal.
This might take the form of a dinner, reward or or even just a brief
article in the company newsletter. Recognition is always most
effective whan it is tied to some *specific* performance or event.

The project approach does not mean that at the end of six months the
50% improvement is cheered and forgotten. That is the way to lose any
gains. Changeover times must be continuously monitored to prevent backsliding.

On conclusion of one project, another must be immediately
implemented. The new project may have a different team and even a
different focus. Like the first, it needs to specific goals and
timetables. Staying with the same 6/50 goal is probably a good idea.
People now have some experience how to reduce changeover. They will
have also, by participating in a successful campaign, have developed
some self-confidence. And of course, the second 50% reduction is
really only a 25% reduction from the original starting point.

I do not disagree with the supporters of "continuous improvement".
All plants MUST engage in it. I think the sequential project model I
discussed above achieves very similar results. The difference is more
in organization and implementation than in underlying philosophy.

TIP OF THE MONTH...
ROBOTIC TOOL CHANGERS

Some systems, such as palletizers or assembly machines, use robots
with grippers that must be changed for various products. Changing
these grippers can be time consuming with a number of fasteners,
electrical and pneumatic connections to be made up. ATI Industrial
Automation ( www.ati-ia.com ) makes an interesting device that does
away with all of this. It consists of two sections, male and female.
The male section is permanently mounted on the robotic arm. Female
sections are permanently mounted on each gripper. The male section
connects with the female via ball locks and locating pins so that it
securely locks into position. As the two sections mate, pneumatic and
electrical connections are also made. There are no tools and, if the
grippers with the female sections are staged appropriately, the robot
can be programmed to change them without any human intervention.






Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way." -
Lazarus Long

#112 From: John Henry <johnhenry@...>
Date: Wed Sep 17, 2008 12:39 pm
Subject: Lean Changeover Newsletter-September 2008 (Time & Thread gauges)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) SEPTEMBER 2008
(+)+(+)
(+)+(+) Replies, inquires and feedback to john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact me at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

=============================================================

My current Food & Beverage Packaging magazine column on OEE and
Changeover is now online at
http://www.foodandbeveragepackaging.com/CDA/Articles/Feature_Articles/BNP_GUID_9\
-5-2006_A_10000000000000402576



SOME THOUGHTS ON...
TIME

A few years ago IBM ran an ad showing a harried looking executive and
the caption was "Innovative thinking? We don't even have time for bad
thinking". I liked it enough that I scanned it and use it in my "Lean
Changeover Made ESEE" workshops. (Thanks, IBM!)

Many face this problem daily. They get caught up in just trying to
deal with the typical daily problems and get product out the door.
This creates a vicious cycle in which the emphasis becomes working
around the symptoms. Lack of time prevents correcting the underlying
or "root" causes of the problem. It is the classic chicken and the
egg. Can't fix the problem because of lack of time, don't have time
it gets used up dealing with symptoms.

I don't need to tell any of you that this is not good. The problem is
how to break the cycle.

One issue is to identify the root causes instead of the symptoms.
Toyota uses a technique that they call the "Five Whys". This uses a
repetitive process to drill down to the root. For example:

Why did Mary slip and fall? (Because there was oil on the floor)
Why was there oil on the floor? (Because a seal was leaking)
Why was the seal leaking? (Because the shaft was scored)
Why was the shaft scored? (Because the mechanic used the wrong tool
eg; ViseGrip pliers)
Why did the mechanic use the wrong tool (Because the proper tool was
not readily available)

As you can see from the above, the problem is not so much the oil on
the floor. That is a problem and it needs to be cleaned up, of
course. If that is all that is done, time will be lost every day
cleaning it and, between cleanings, another accident may occur. Even
replacing the seal, if not done correctly, will not permanently solve
the problem. The real solution is to make sure that the proper tool
is readily available to the mechanic. Note the phrase "readily
available". It may not be enough to have the tool in the tool crib.
If it takes too much time to get the tool, and there is too much
pressure to get the machine back up and running, the improper but
available tool may be used.

Training also enters into it. Many plants do not provide regular
training to mechanics and technicians. After all, they are supposed
to know this stuff, right? The mechanic in the above example may have
used ViseGrips simply because they did not know that this was not the
proper tool.  And, since there is pressure to keep the machines
running, there may not be time for training.

Another time consumer is troubleshooting. In my experience most of
the time spent in repairing machinery is spent figuring out what is
wrong. Fixing it is usually the easy part. Many mechanics and
technicians have never been trained to approach troubleshooting in a
systematic fashion. Too often it is "tinker with this adjustment,
replace that part". Keep repeating until the machine works again. It
may not work correctly and they may not have any idea what they did
to actually fix it. It is working and the supervisor is off their
back. That is the important thing. (They think!)

Not only is more time spent than necessary in correcting the problem,
future time is lost because it was not properly and permanently fixed.

There is always enough time for repairs, though, as I mentioned
above, perhaps not enough time to permanent and proper repair.
Strangely, there is often not enough time to prevent the need for the
repair in the first place. Preventive and predictive maintenance take
time. They may require that machines be stopped. Plants may be
unwilling to do this. There are two paybacks: 1) the stoppage can
occur at the most convenient time rather than the least convenient
time for a breakdown. 2) The amount of time spent preventing the need
for repair will most likely be less than the amount of time spent
making the repair. Plants with good P/PM programs will run more
smoothly, operators and technicians will be happier and production
levels will be higher. Sure it takes an effort in time and money. It
always pays.

Time is our most precious resource. There is only so much of it. The
only way to get an edge on time is to use it more wisely. Root cause
analysis, training, effective troubleshooting and P/PM are tools that
will help you do this.

The above is drawn from my Effective Troubleshooting Workshop. If you
would like information on how you can schedule this workshop in your
plant, give me a call at 787-550-9650 or e-mail john@...


TIP OF THE MONTH...
THREAD GAUGES

Sometimes simple things can have big positive impacts. One of my pet
peeves is the amount of time spent looking for the proper nut or
bolt. An even bigger peeve is the damage done when the wrong fastener
is used. For example a fine thread with a course bolt or a metric
bolt with a standard thread.

I recommend that every mechanic have a thread and fastener diameter
in their toolbox and they be encouraged to use it. These are cheap
and simple. You might even be able to talk your hardware supplier
into giving you some.


Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way" -
Lazarus Long



Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way" - Lazarus Long

#111 From: John Henry <johnhenry@...>
Date: Wed Aug 20, 2008 3:59 pm
Subject: Lean Changeover Newsletter-August 2008 (Ford & Ford)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) AUGUST 2008
(+)+(+)
(+)+(+) Replies, inquires and feedback to john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact me at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

=============================================================

Do you use vibratory bowl feeders in your plant? Are they "in tune"
and running correctly right now?

These workhorses of assembly automation are too often poorly
understood by the mechanics and technicians who service them. My
workshop, "Understanding Vibratory Feeders" is based on 22 years of
working on their design, operation and maintenance. It explains the
basic and theory of operation. Once this is understood, your
technical people will find them as simple as pie.

The workshop combine theory as well as practical hands-on practice.

For more information or to schedule a session in your facility, call
me at 787-550-9650 or e-mail me at johnhenry@...




SOME THOUGHTS ON...
THE FORD PRODUCTION SYSTEM

Unless you are a hermit in the Himalayas you have most likely heard
of the Toyota Production System. It is usually held up as the
capstone of lean manufacturing.

Have you ever thought about how it came to be?

I didn't know much more than the average person about Henry Ford
until a about 8-9 years ago. Yes, I knew about the wonderful Model T,
the $5 wage and the moving assembly line but did not really know what
it meant to the world. Perusing their catalog one day I saw that
Productivity Press had published his book "Today and Tomorrow".  I
enjoy reading industrial history so bought it on a whim. When I read
it, I was blown away. What really astounded me was a few years later
when I found the text to his first, 1923, book "My Life and Work"
I've read hundreds of books on manufacturing management, lean, six
sigma and related topics but this was something else. All those
things we thought we had taken from the Japanese in the 80's and 90's
were common practice at Ford in the teens. He had built the entire
company around lean manufacturing and took it to extremes.

In the process he was able to produce 20 million model T's while
reducing the price from about $850 to $250 over a 20 year period. He
almost single handedly moved the world from horses to horseless
carriages. We probably all knew that. What we probably didn't know (I
didn't) was how he did it. He did it by relentlessly applying a
philosophy of eliminating fat from his manufacturing operation. In
other words, what we today call lean manufacturing.

He eliminated as much walking around as possible. The work was
brought to the man rather than the man to the work. "Save ten steps a
day for each of twelve thousand employees and you will have saved
fifty miles of wasted motion and misspent energy."... "The undirected
worker spends more of his time walking about for materials and tools
than he does in working; he gets small pay because pedestrianism is
not a highly paid line." (Chapter 5)

He spent a lot of effort optimizing workstations before most people
even knew the word ergonomics: "We now have two general principles in
all operations--that a man shall never have to take more than one
step, if possibly it can be avoided, and that no man need ever stoop
over." (Chapter 5)

Leveling production? It's in there: "We very shortly found that we
could not do business on order. The factory could not be built large
enough--even were it desirable--to make between March and August all
the cars that were ordered during those months. Therefore, years ago
began the campaign of education to demonstrate that a Ford was not a
summer luxury but a year-round necessity." (Chapter 11)

Lean documentation? Sure: "We abolished every order blank and every
form of statistics that did not directly aid in the production of a
car. We had been collecting tons of statistics because they were
interesting. But statistics will not construct automobiles--so out
they went." (Chapter 12)

Quality? He built the business on it: "And success in manufacture is
based solely upon an ability to serve that consumer to his liking. He
may be served by quality or he may be served by price. He is best
served by the highest quality at the lowest price, and any man who
can give to the consumer the highest quality at the lowest price is
bound to be a leader in business, whatever the kind of an article he
makes. There is no getting away from this." (Chapter 9) See also, in
his later book "Moving Forward", his chapter written by Carl
Johanssen of Jo Gauge fame, on the importance of precise measurement.

Worker participation in improvements. Check: "In one of the stamping
operations six-inch circles of sheet metal are cut out. These
formerly went into scrap. The waste worried the men. They worked to
find uses for the discs. They found that the plates were just the
right size and shape to stamp into radiator caps but the metal was
not thick enough. They tried a double thickness of plates, with the
result that they made a cap which tests proved to be stronger than
one made out of a single sheet of metal. We get 150,000 of those
discs a day. We have now found a use for about 20,000 a day and
expect to find further uses for the remainder. (Chapter 10)

He lived on the "learning curve" was long before anyone thought to
give it a name. He knew that by making more cars he could drive his
costs down and, as he drove the costs down, he could make more cars.
We might call a virtuous cycle.

Ford applied his ideas not only to cars. He also tells of applying
the same principles in a railroad, a large hospital and a technical
school. All with excellent results.

This is an old book and was out of print in English for more than 70
years. I have been told that it has never been out of print in
Japanese. If you want to learn about lean manufacturing, learn from
the master who invented it, Henry Ford.

The real shame is that, in the US we knew all this stuff. Ford had
shown us that it worked and had freely shared all of his techniques.
And yet we somehow lost it. Thankfully we are getting it back.

TIP OF THE MONTH...
FORD'S BOOKS

Henry Ford, with Samuel Crowther, published 4 books in the 20's. "My
Life and Work", discussed above, is the most valuable, in my opinion.
It is available in several ways. The best is to buy a trade paperback
edition
from  https://www2.xlibris.com/bookstore/bookdisplay.asp?bookid=32476
This has the advantage of a nice binding and typesetting as well as
an introduction by myself. It is also available free for download at
http://www.gutenberg.org/dirs/etext05/hnfrd10.txt It is also
available from www.kessinger.net as a bound photocopy of the original text.

"Today and Tomorrow", Ford's second book is available from
Productivity Press www.productivityinc.com

His final book on manufacturing, "Moving Forward", written in 1929,
is available in a Kessinger edition.

Ford got his start working for Westinghouse Electric and later
Detroit Edison Electric. In his later years he and Thomas Edison
became friends and he wrote a book "My Friend Thomas Edison". It
doesn't have any manufacturing secrets but, if you enjoy biography,
is worth reading. It too is available in a Kessinger edition.





Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way" -
Lazarus Long



Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way" - Lazarus Long

#110 From: John R Henry <johnhenry@...>
Date: Tue Jul 15, 2008 1:29 pm
Subject: Lean Changeover Newsletter-July 2008 (Changeover defined & Threading)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) JULY 2008
(+)+(+)
(+)+(+) Replies, inquires and feedback to
<mailto:john%40changeover.com>john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
<http://www.changeover.com>http://www.changeover.com or contact me at
<mailto:john%40changeover.com>john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
<mailto:quickchangeover-subscribe%40yahoogroups.com>quickchangeover-subscribe@ya\
hoogroups.com

To unsubscribe send a blank e-mail to:
<mailto:quickchangeover-unsubscribe%40yahoogroups.com>quickchangeover-unsubscrib\
e@yahoogroups.com

=============================================================

My current "Machinery Matters" column, on OEE, is here:
http://www.foodandbeveragepackaging.com/CDA/Articles/Feature_Articles/BNP_GUID_9\
-5-2006_A_10000000000000363490


If you are interested in reducing changeover, you need to implement a
systematic program. My workshop "Lean Changeover Made ESEE" explains
how to develop this program along with techniques for reducing
changeover times. It includes changeover simulation as well as
changeover improvements in your plant.

Call John Henry at 787-550-9650 or e-mail john@... to
arrange a session in your plant.

Now also available via videoconferencing.

SOME THOUGHTS ON...
CHANGEOVER DEFINITIONS


  From time to time it is essential to go back and refresh the basics.
In discussing changeover, there is nothing more basic than the word
itself. It is a simple word and everyone knows what it means. If I
ask 5 people, all 5 can define it. The problem is that I may get 6
different definitions. It is important that everyone within an
organization use the same definition. If not, it is impossible to
discuss changeover meaningfully.

Here is the definition I recommend:

"Changeover is the total process of converting a machine or line from
running one product to another."

The key word in that definition is "total". Any definition of
changeover must include cleaning, prep work, machine adjustment
(A/K/A setup), materials and product movement, line clearance,
documentation and anything else that is required to complete the
previous product run and begin the succeeding one.

Breaking changeover into sub-parts may help with understanding it. I
call these the 3-Ups.

Clean-Up is everything involved in removing the product, materials
and components of the previous product from the line. In some cases
this might be as simple as dumping them into boxes and moving them
out and might take 5 minutes. In others it might require complete
disassembly of the machinery, washing and sterilization and might
take a full shift or more.

Set-Up is often used synonymously with changeover. It should not be.
It is a part of changeover, not the whole thing. It is the
modification of machines to set them for the next product. This may
be changing of product specific parts ("change parts") or the
adjustment of machine components. In most cases, it is a combination of both.

Start-Up is the process of bringing a line up to normal running speed
and efficiency after clean-up, set-up and line charging are complete.
This can take a few minutes or as long as a few shifts. It may be
caused by variability in product or materials. Most often it is
caused by variability in the way the clean-up and set-up were done.

Documentation, material movement and inspection are all tasks that
are part of changeover and fall within one or more of the 3-Ups.

Changeover time is another term that needs to be uniformly defined.
There are various definitions and the uniformity of definition within
an organization is more important which definition is used. Here is
the definition I have found most useful:

Changeover time is the total elapsed time between the last unit of
good production of the prior product at normal speed and efficiency
to the first unit of good production of the succeeding product at
normal speed and efficiency.

That is quite a mouthful and can be abbreviated as "Changeover time
is the elapsed time from good product to good product" When using
this definition the normal speed and efficiency is implied in the words "good".

The key word to bear in mind here is "elapsed time". Labor hours are
fairly cheap, normally in the $20-30/hr range. Production hours are
very expensive, typically thousands or even tens of thousands of
dollars per hour. Changeover must focus on keeping the lost
production hours to a minimum even though this might mean using more
labor hours.

Another term in common use is "Quick Changeover". This means reducing
the changeover time as much as possible. I used to use it myself but
realized a few years ago that semantically it was somewhat
self-defeating. Many people, especially the mechanics, technicians
and operators on the changeover front line hear "quick" and shudder.
Too many times it means that they are expected to do the same thing
but to do it faster by working harder. It may be possible to force
them to work faster for a while. The end result is likely to be an
unhappy crew and any gains will be transitory. Changeovers done under
hurry-up pressure are likely to be done less carefully resulting in
more operational problems. In short, while the goal is good, the
methods may not be. Even when the methods are sound, calling it
"quick" is likely to raise red flags in many minds.

When I realized the problems caused by "Quick Changeover" I looked
for a better term and realized that "Lean Changeover" fit what I was
trying to do to a T. Lean, as applied to changeover, means the same
thing as in "Lean Manufacturing". That is, it is a process from which
all waste has been removed. This includes wasted time and the end
result of lean changeover is shorter changeover times. An additional
benefit is better and more precise changeovers resulting in higher
OEE's and better quality product.

Words have meanings. Too often, they have different meanings to
different people. If words are not used uniformly within the
organization, poor communication will be the result. Poor
communication will result in poor efficiency and poor productivity.

TIP OF THE MONTH...
THREADING

Many machines such as baggers, labelers, winders, extruders and
others require threading material eg; filmstock through a complex
assortment of rollers and guides. Most have a threading diagram to
show the correct path. The diagram is essential and, if a clear, easy
to read diagram is not already on the machine, make one and post it.

An improvement on the diagram is marking each roller or guide that
the film touches with a dot of red paint. This dot will indicate the
side of the roller that the film is supposed to touch. EG; If the
film is to pass over the top of a roller, put a red dot on the roller
support indicating this.


Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way." -
Lazarus Long

#109 From: John Henry <johnhenry@...>
Date: Wed Jun 18, 2008 2:35 pm
Subject: Lean Changeover Newsletter-June 2008 (ESEE & OEE)
johnrhenrypr
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+) JUNE 2008
(+)+(+)
(+)+(+) Replies, inquires and feedback to john@...
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact me at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

=============================================================

The Lean Changeover Newsletter has been on a bit of a hiatus but is
back. I will be publishing a new letter around the middle of each month.

This month I was lucky and got a special deal on the letter "E".


SOME THOUGHTS ON...
ESEE CHANGEOVER

One of the problems I have found with changeover is that it can be
overwhelming. This makes it hard for many people to get their arms
around it and they don't even begin. There is an old saying in my
neighborhood that "You can eat an elephant if you cut it into bite
size pieces." Changeover is much the same way. If it can be broken
down and attacked systematically it becomes ESEE to make a
significant dent in changeover times.

One tool I have developed I call ESEE. In this acronym can be
encompassed everything necessary to begin as well as finish a
changeover project. At least to the extent it can ever be finished.
There is always room for further improvement but that is a subject
for another day.

ESEE stands for Eliminate, Simplify, Externalize, Exactly!

The Eliminate step comes first because there is no point whatsoever
in improving something that doesn't need doing in the first place.
Look closely at every changeover task and ask "Why is this being
done? What would happen if we stopped doing it?" Some of you might
say that everything you do is necessary. Are you sure? Far too often
we start doing things for excellent reasons but continue to do them
after the need has gone. Do you adjust conveyor rails on both sides?
Ask why. Is it really necessary? If not necessary, stop.

Simplification is just that, look at every task and activity in
changeover and ask how it could be made simpler. Tools should never
be used for routine changeover. Time is spent looking for them, the
wrong tool is used either by accident or because the right tool was
not available, worn tools cause damage, tool usage requires more
skills...(Need I go on?). If you need to adjust photoeyes, simplify
it by mounting multiple photoeyes, pre-positioned and calibrated, for
each setup. Connect them via a selector switch. Anyone can set the
switch in seconds as opposed to spending 5 minutes or more tinkering
with moving and adjusting a single eye.

Externalize all possible tasks. This means doing them while the line
is running. Do machine parts require cleaning? If there are 2 sets of
parts, the previously used "dirty" set can be removed and set aside.
The clean set is mounted and the line restarted. There is all the
time in the world to clean the dirty set. Some may say that an
additional set of parts costs a lot of money and that is often true.
But what does line downtime cost? Line downtime is frequently
measured in tens of thousands of dollars per hour. Twenty, or even
forty thousand dollars worth of duplicate parts would pay for
themselves in weeks.

Exactly! means that all tasks must be performed exactly the same way,
to the same end result every time, regardless of who performs them.
If the capper chuck is supposed to be adjusted close to but not
touching the cap, what does that mean? Each mechanic will have a
different opinion with one thinking 1/32" is close and another
thinking 1/4" is close. To perform changeover exactly there first
needs to be a detailed SOP describing how it is to be done, including
quantitative values for all setpoints. Second, for the SOP to be
usable, there must be a way for the mechanic to verify that the
correct setpoint was achieved. This may be scales, digital
indicators, force gauges, temperature indicators and so on. Either
one without the other is little more than a decoration.

Changeover is hard. Reducing changeover time and keeping it reduced
is even harder. A logical system for attacking it can make it ESEE.
(And easier)

So what do you think, can you make your changeovers ESEE? I welcome
all feedback and if you have questions I'll be happy to answer them.
E-mail me at johnhenry@... If you have not visited
www.changeover.com lately I recently remodeled so please stop by.

If you really want to know how to make changeover ESEE, ask me about
my "Lean Changeover made ESEE" workshop/kaizen


TIP OF THE MONTH...
OEE MONITORING (I told you I got a deal on the letter "E")

OEE stands for Overall Equipment Efficiency and is a pretty good
metric of how a manufacturing, assembly or packaging line is running.
It is the product of Performance, Availability and Quality (PAQ) Lots
of info about it is available at www.oee.com .

Vorne Industries, which runs the oee.com site makes an excellent line
of OEE display panels. These are LED displays which can be set to
display OEE and other operating parameters on a minute by minute
basis. Unlike some of the fancier SCADA systems, these are very
affordable. For information, visit
http://www.vorne.com/display-types.htm#Production_Monitors


Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way" -
Lazarus Long



Best,

John R Henry CPP

www.changeover.com
787-550-9650

"All progress is made by a lazy person looking for an easier way" - Lazarus Long

#108 From: John Henry <johnhenry@...>
Date: Thu Oct 25, 2007 2:23 pm
Subject: Lean Changeover Newsletter October 2007 Muda & Glassboards
johnrhenrypr
Offline Offline
Send Email Send Email
 


(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
### OCTOBER 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================

I will be offering the Achieving Lean Changeover Workshop through Pharma-Bio Serv Inc at their training facility in Dorado PR on November 28, 2007. This workshop will include a a hands-on practical demonstration of changeover improvement as we take the Changeover.com Super Duper Monster Making Machine from a 15-20 minute changeover to less than 1 minute. (My personal best is 43 seconds - blindfolded!)

Come join us. For complete information visit www.changeover.com and click on the banner ad link on the home page.



HELP NEEDED!

I am researching operating/maintenance/changeover manuals and documentation as supplied by builders of all types of production, assembly and packaging machinery. I have some thoughts on this (see my recent column in Food & Drug Packaging Magazine at http://www.fdp.com/content.php?s=FP/2007/10&p=12 ) but would like to know yours. Specifically:

How would you rate manuals in terms of usability and usefulness?
What information would you like to see included that is not currently there?
How would you rate the quality and level of writing?
Are there sufficient illustrations? (Photos, exploded diagrams, schematics etc)
Do you prefer paper or electronic format?
Should manuals be included in the machine HMI where the capacity exists?
General comments about what the ideal manual should look like.

I will keep all information confidential. Please send comments to john@...


SOME THOUGHTS ON...
MUDA & THE SEVEN WASTES

As I was typing the title, I thought is sounded like a good name for a fairy tale. Muda is no fairy tale, though. Muda will kill a company dead.

“Muda” is the Japanese word for “waste”. Most manufacturing plants have far too much of it. It is almost never something that anyone plans, it just sort of happens. If not nipped in the bud, it will grow till it takes over. A common cause is that something is done for a good reason but then keeps being done long after the need has passed. I have read that in the early 1800's a sentry post was manned on England’s south coast to sound the alarm if Napoleon’s invasion fleet was spotted. The post was forgotten and was still being manned 100 years later, long after any need had passed.

The Toyota Production System identifies seven kinds of waste. Actually, Henry Ford had identified all of these in his 1923 book “My Life and Work”
http://www2.xlibris.com/bookstore/bookdisplay.asp?bookid=32476
Toyota copied this and more from Ford and still gets the glory.

In any event, the seven wastes identified are:

(Chapter numbers refer to “My Life and Work”)

1. Overproduction.

Overproduction means manufacturing more of a product or component than is needed. This is wasteful in a number of ways but the most wasteful aspect is that it clutters up the plant with excess inventories, slowing production flows. In addition to its effect on operations, holding inventories adds cost at any level while providing little benefit. Inventories typically cost in the neighborhood of 30% or more per year. Over production uses resources which can often be put to better use.

2. Waiting

Waiting is dead time where no value is being added. As components wait between processing steps, they form work in process, WIP, inventory. Again, this inventory is not only expensive simply to hold, it has a negative impact on other operations.

3.  Transporting

Transporting loses time as components are moved from one place to another. Again, products in transport are having no value added. They also incur costs due to the need for personnel and equipment for transport.

4.  Inappropriate Processing


“Overkill” is the term that comes to mind here. Sophisticated, high tech, equipment is used where there may be a simple, low tech solution. This eats up capital. If the workforce is not at the level required for the high tech solution, they may not be able to operate or maintain it effectively. This will result in additional costs.

5.  Unnecessary Inventory

Some inventory is often necessary to smooth out variability in material flows. In many cases, more inventory is held than is really necessary “just in case”. The first stage solution is to cut inventories to what is necessary. The real solution is to find out why there is variability in flows and eliminate or reduce them.

6.  Unnecessary / Excess Motion

Many workstations and jobs are poorly laid out. This causes unnecessary walking, twisting, bending, lifting and other motion. All tasks must be analyzed and optimized for the bare minimum of motion by the operator.

7.  Defects

Defective components or worse products are never a good idea. There are two approached to defects: One used to be called “quality control” and called for catching and removing the defective parts by inspection. This may be better than nothing but not much since the defective part is still produced and it still costs as much to make a bad part as a good one.

The other, better approach, was called “quality assurance” back in the 70's when I was in grad school. The goal of QA was to make sure the process could not produce a bad product.

Today, neither term seems to be used much, the more generic “quality” seems to be preferred.

Whatever it is called, the goal needs to be to make sure the process will not produce a bad product.

Nobody will pay us anything for waste. We must work ceaselessly to eliminate it.


TIP OF THE MONTH...
GLASSBOARDS

I have been teaching and training long enough that I can remember chalkboards. Thankfully these are mostly gone, replaced by whiteboards. Whiteboards are a big improvement but one of the problems I often have is erasing them completely.

A couple months back I was at a client and instead of whiteboards, they have glassboards. These were clear panels of glass mounted in front of a white wall. I have never seen them anywhere else and don’t know if they are commercially available. I do know that I liked using them. They were smooth as butter to write on, highly legible and erased completely.



Best,

John R Henry CPP

www.changeover.com
787-550-9650

Best,

John R Henry CPP

787-550-9650

#107 From: John Henry <johnhenry@...>
Date: Mon Sep 24, 2007 9:36 pm
Subject: Lean Changeover Newsletter September 2007-Time and timekeeping
johnhenry@...
Send Email Send Email
 


(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
### SEPTEMBER 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================

I will be offering the Achieving Lean Changeover Workshop through Pharma-Bio Serv Inc at their training facility in Dorado PR on October 26, 2007. This workshop will include a a hands-on practical demonstration of changeover improvement as we take the Changeover.com Super Duper Monster Making Machine from a 15-20 minute changeover to less than 1 minute. (My personal best is 43 seconds - blindfolded!)

Come join us. For complete information visit www.changeover.com and click on the banner ad link on the home page.

SOME THOUGHTS ON...
TIME IS OF THE ESSENCE

When you go to Las Vegas (hint, hint: I will be speaking at PackExpo next month on saying no to quick changeover. www.packexpo.com for more detail) you will probably go to a casino. It is almost impossible to avoid, even for non-players. One thing you will never see in a casino is a clock. Casinos are sophisticated machines for separating the player from their money and the more time the player spends, the more money can be separated. The last thing they want is for the player to be aware of how much time they spend playing.

What about your plant floor? I am sure we will agree that the opposite principle applies. On the plant floor, time is of the essence, as the saying goes. Production is maximized by maximizing run times and minimizing down times.

So how many clocks are there in your production area? One? Stuck over by the supervisor=s station? Time is one of the most crucial variables in production. It is also the scarcest resource and once gone, it can never be recovered. Time, like anything else, can only be controlled if it is measured.

Associates need to have a sense of urgency imparted to them. This is partly cultural. Supervisors need to explain how important time is. They need to explain, in terms the associates can understand, the cost of time. One way is to explain it in terms of lost production. E.g.; if a line running 200 products/minute is down 1 additional minute/day, this represents the loss of 48,000 units or more than half a day of production. They need to have the dollar cost of this loss made clear to them.

Time flies when you are having fun. It also flies when you are working. Our internal mental clocks tend to be inaccurate. We may think we are accomplishing a task quickly when in reality we are not. Clocks need to be readily available in strategic positions along the line. These need to be big, legible, clocks and visible from anywhere on the floor. They also need to be digital clocks. Analog clocks tend to make us think in 5 or even 15 minute segments of time. Digital clocks make us think in minutes or even seconds. Red LED displays are visible over long distances if sized correctly. Simple clocks can show simple time of day. More sophisticated systems can show time since task start, time remaining or time as measured in units of production. In one plant I worked in, there was a large display screen over the end of the line. This normally displayed production information. Whenever the line stopped, though, the display would switch to a counter mode. This mode displayed dollars and updated every second. (about $0.70/second). I found out about this when I asked them if I could stop the line to take a measurement. They stopped the line and pointed out the display. I can assure you that it imparted a sense of urgency in me!!

For repeatable tasks, such as changeover, time standards must be set. Knowing how long something is taking is helpful but not as useful as it could be. Standards must be set and the employees must know what the standard is. These standards should be reasonable and realistic. That is, not so tight that they are not achievable, yet not so loose as to waste time.

Finally, employees must be held to the standards. That means the times must be measured, recorded and tracked. Unless they are, time standards become meaningless.

Having said all that, let me say this: Be careful in how you approach this. Time standards and accountability can be intimidating if dropped suddenly onto the associates. Take it gradually and be sure to explain exactly what it happening and why. Get the associates involved in reducing lost time.

Timing and standards can be very helpful if done right. They can be very hurtful if done wrong.

TIP OF THE MONTH…
CLOCKS AND COUNTERS

A source for timekeeping devices is Alzatex Corp at
https://www.alzatex.com
They have a wide variety of clocks, timekeeping and counting systems. One item that might be of interest is their line of lean manufacturing systems such as counters showing actual production vs goal on a second by second, real time, basis. See
  https://www.alzatex.com/background/Lbkgnd.html
for more information. The page also has some good background information on lean manufacturing that may be of interest to many here.

One important issue is keeping all clocks in a plant synchronized. BRG Precision has a wide variety of clocks suitable for industrial use. Many of the systems can be linked wirelessly to a master clock to keep all displaying the same time.
http://www.brgprecision.com

Best,

John R Henry CPP

www.changeover.com
787-550-9650


#106 From: John Henry <johnhenry@...>
Date: Thu Aug 30, 2007 4:48 pm
Subject: Lean Changeover Newsletter August 2007-ESEE & Hand dryers
johnhenry@...
Send Email Send Email
 


(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
### AUGUST 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================

Are you satisfied with your changeovers? Are they fast enough? Are they precise enough? I can show you how to make changeovers leaner, faster and more precise. E-mail me at john@... or call me at 787-550-9650 and we can discuss how I can help.



In September I will be speaking on Quick Changeover Packaging (QCOP) at the Contract Packaging Association's annual conference and show. This takes place on September 11 & 12 at the Chicago O'Hare Hilton. More info at
  http://www.packworld.com/cp07

I will also be speaking about Lean Changeover at PackExpo in Las Vegas on Tuesday October 16. More info at http://www.packworld.com/cp07/

If you are there, look me up and say Hi. I'll even buy the coffee!


SOME THOUGHTS ON...
CHANGEOVER IS ESEE

I have long thought that reducing changeover time is simple. I still believe that. Achieving lean changeover is a matter of paying attention to detail and making lots of small improvements. On the other hand, to paraphrase Deming: "I never claimed it was easy, I only claim it will work."

I have sort of changed my mind on that. While I still don't think it's easy, I do think it is ESEE. ESEE is an acronym describing the 4 steps to lean changeover.

E-liminate:

In any changeover there are unnecessary tasks being performed. These may include things like adjustments of conveyor rails.

How many brackets need to be adjusted? In a recent project in a bottle molding plant we found that there were guide rail brackets every 2 feet yet. Since these were empty plastic bottles, hanging from their necks, this was way more than needed. We removed every other bracket. On several hundred feet of conveyor this single improvement saved about 15 minutes per changeover. Assuming 3 changeovers per day, 240 days per year, this amounted to an additional 7-1/2 DAYS (No, that is not a typo. You can do the math) of production time annually per line. (See? Simple changes can have huge paybacks. I can help you find opportunities like this in your plant.)

Product design will also present opportunities for eliminating changeover. A particularly dramatic example is Coke and Pepsi. Both produce a variety of cola, flavored, juice and water products in 20oz PET bottles. Pepsi uses the same bottle for all products. Other than the label, cap color and, in the case of 7-Up, the bottle color, there is no package change. Coke produces much the same range of products but uses 5-6 different bottle shapes. This will necessitate a lot of changeover downtime.

Even documentation may present opportunities. At one client, during product changeover there were at least 4 sets of documents that needed to be completed (manufacturing, materials, quality, maintenance). About 75% of the information on each document was the same. Combining everything on a single document that all departments would use eliminates calculation and writing time.
                                                              
S-implify:

Simplifying changeover tasks can be as basic as replacing bolts, nuts and screws with handknobs and levers. Get rid of all tools. They slow changeover because:

1) Time is spent looking for the right tool.
2) If the right tool such as a wrench is not found, the wrong tool, such as Channellocks will be used damaging the fastener
3) Some plants, by policy or by union contract, do not permit operators to use tools. There are many changeover tasks operators might otherwise be able to do. This frees up more skilled associates for higher level tasks

If tools can't be eliminated, find the most appropriate tool and make sure it is readily available. If repetitive tasks need to be done eg; removing 55 die bolts on a tablet press, provide proper pneumatic or power tools.

Simplify photoeye and sensor setup. Instead of repositioning a photoeye, mount multiple eyes, one for each product. Position and sensitivity are dialed in and a selector switch is used to select the proper one. This could even be done automatically via PLC.

Conveyor rail adjustment is time consuming and often imprecise. Septimatech ( www.septimatech.com), Changeparts Inc ( www.changeparts.com), Autopak (www.autopak.com) and Dillin Automation (www.dillin.net) all make systems which allow long sections of conveyor rail to be adjusted to a digital setpoint from a single position.

E-xternalize:

Externalization means performing changeover tasks outside of the changeover downtime. In other words, while the line is running.

Many lines will use hotstamp printers, wheel coders or debossers to print a production code on the product. Often the process is 1) stop the line 2) remove the coder chase or wheel, 3) spend 5-10 minutes fiddling with the characters 4) replace the chase or wheel. If there is an additional chase, it can be set up ahead of time and swapped out in as little as 30 seconds. While the amount of labor in the task has remained the same, or maybe even increased, labor time is cheap, measured in $10's/hour. Changeover downtime is expensive, measured in $1,000's/hr. Don't keep the line stopped for tasks that don't need it stopped.

Liquid filler components may be time consuming to clean and sanitize. If additional sets are purchased, this cleaning no longer holds up changeover. As expensive as these parts may be, payback is usually in months. Sometimes even in weeks.

E-xactly!

Changeover must be done exactly. Anything less than perfection in the changeover will lead to time spent struggling to get the line running correctly. In the good old days of long production runs, this was not as much of a problem. There was plenty of time to do this. Now, with more frequent changeover and shorter runs, there is not.

While some of this startup time can be due to variability of materials, the bulk of it is due to imprecise machine adjustments. If you don't measure adjustments, you will not control them. All adjustments must be done to precise setpoints. Scales, mechanical or electronic digital indicators, gauges, scribe marks and detentes are all ways of accomplishing this. In addition to position indicators, good thermometers, pressure gauges, tachometers and other instruments must be provided.
                                                                                                           
If there are only a few products to be run, one technique is colored marks. This allows the operator to know that for Product Alpha, all adjustments are made to the red mark.

Just having the indicators in place is not enough. If the person performing the does not know what the setpoints are supposed to be, they are simply decorations. A setup chart showing all setpoints must be readily available at the point of use. There also needs to be good SOP's as well as checklists to assure that everyone performs changeovers the same, optimal, way.

For cleanup and setup the goal must be reduction of the line downtime required. For startup, the goal must always be elimination. This may not always be totally achievable but it does need to be the goal. The only way to meet this is by making changeovers exact.

As I said, changeover is not easy but it can be ESEE.

For more ideas, information about my Achieving Lean Changeover workshops, Kaizen events and other services, e-mail me at john@... or call me at 787-550-9650.

Changeover doesn't have to be hard.

TIP OF THE MONTH...
XELERATOR HAND DRYERS

I absolutely hate hand dryers. It seems like I stand there for a full minute and then wind up wiping my still wet hands on my pants. No more. I have recently run across a couple of installations of the Xlerator dryer from Excel Dryer Corp. www.exceldryer.com

This looks like a fairly typical hand dryer until you activate it. The secret is that it uses a high speed jet of hot air to completely dry your hands in about 10 seconds.

It really works.

Really!


Best,

John R Henry CPP

www.changeover.com
787-550-9650


#105 From: John Henry <johnhenry@...>
Date: Mon Jul 16, 2007 5:40 pm
Subject: Lean Changeover Newsletter July 2007-Champion & Wall Washing
johnhenry@...
Send Email Send Email
 

(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
### JULY 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================

SOME THOUGHTS ON...
CHANGEOVER CHAMPION

I have written here about the need for everyone, from all departments, to be involved in changeover. Today I want to write about what I think is the key person in any lean changeover project.

I call this person the “Champion”. These days we think of this word as signifying “the best” at something competitive, usually a sport. We have tennis champions, football champions and so on.

Another meaning of the word is “to advocate” (as a verb) or a person who advocates (as a noun). It is in this sense that I use “Champion” in changeover.

An orchestra, without a conductor, is a chaos of sound and accomplishes little. A changeover project needs a conductor as well. It needs someone who will take the project in hand and run with it. It needs someone who can assign tasks to the best qualified person, do followups to make sure they get done, request and obtain resources and issue reports on goals and accomplishments. In other words, the champion is the person who will have day to day charge of the lean changeover program.

So what qualifications should the champion have? Where should he or sh come from?

The most important qualification, in my opinion, is enthusiasm. They must believe in lean changeover down to their toes. Actually, I think enthusiasm is a good pre-requisite for any position. That is probably another essay. I have mixed feelings about whether specialized expertise in any particular is a good or a bad thing. The drawback to specialization is that the specialist may tend to focus on their particular area of expertise at the expense of others. As the saying goes “When the only tool you have is a hammer, everything looks like a nail.” I think it is better to have a champion who has broad general knowledge of the manufacturing process. That broad knowledge needs to be combined with the willingness and ability to seek out and use specialized knowledge from others.

The champion must have a curious mind. They must have the type of mind that asks “Why...” and then finds the answer. They must be willing to look for solutions from a diverse variety of sources. In my workshops and consulting practice I have found that many people have rather industry specific knowledge. The person working in the pharmaceutical industry will tend to work for other pharmaceutical companies, go to pharmaceutical conferences and trade shows, visit other pharmaceutical plants, speak with colleagues in the pharmaceutical industry. They are unlikely to know much abotu what is going on in the food industry, the household products industry or other industries.

This is a natural tendency but is still limiting. In my Achieving Lean Changeover workshops I do not try to focus on the client’s industry. I show everybody everything. I almost always run across something that nobody is familiar with but is common in other industries.

The champion needs to be curious about what other companies, within and without their industry are doing. They need to be thinking “Would that idea be useful in our plant? How can I adapt it?”

Along with the above, the champion needs to be immune to the “not invented here” disease. There needs to be a willingness to accept other ideas.

The champion needs to have confidence in themselves. It is possible to reinforce confidence but it must be there to start with. Nobody can be a competent advocate for anything without confidence. In addition to confidence in themselves, the champion must have the confidence of others in the organization.

Choosing and announcing the champion is not enough. They need to be supported. This may take the form of training. The person with all of the above qualities still needs to know something about how to analyze changeover and find cost effective ways to improve it. This may mean training, either on or off site, by company or outside trainers. It can mean visiting other plants to see best practices. It can mean attendance at conferences and trade shows. It is unfair to the champion to expect them to be able to discover opportunities without giving them the opportunity to lean how.

The champion must be supported. They must be able to call on resources from other departments. As an example, in order to determine cost effectiveness of improvements it is essential to know the cost of downtime. This cost has to be provided by the accounting or finance department. The champion must be able to have the management support to get them to provide this info.

You may notice that I have said nothing about where the champion should come from and there is a reason for that: I don’t know!

Seriously, the champion can come from anywhere. It can be a person hired for this purpose, it can be an engineer assigned to the job. It could be a manager or supervisor or it could be a person from the floor. I think that if they have qualities mentioned above, plus some other qualities which will vary from plant to plant, they can come from anywhere.

The key is, if you do not already have a changeover team and a champion, you are behind. You need to do it today.

<Shameless plug: If you are interested in reducing changeover times in your plant, call me at 787-550-9650. I have a whole toolbox of ways I can help you. I assure you that I have more than a hammer.>


TIP OF THE MONTH...
WALL WASHING

Last year I had discussed the Tucker USA Company at www.tuckerusa.com They make a line of washing equipment for billboards and other vertical surfaces that I think would be very helpful in cleaning manufacturing areas.

I stand by that recommendation but I have since found something will be better for some applications. It is the Core2Clean system from Veltek Associates http://www.sterile.com/pages/products/products_core_2_clean_system.htm


The concepts are similar but with some important differences. The Tucker system uses a pressure hose with a siphon to the detergent/sanitizer. In some applications where the precise amount of detergent is critical this might not be accurate enough. The Core2Clean system uses a pressurized tank to supply the washing wand. This allows for precise premixing and dilution of the washing solution in the tank.

The system is also specifically designed for pharmaceutical and clean room applications.

The system is somewhat more expensive so my recommendation would be to look at both them and the Tucker system. Then decide which is more appropriate for a particular application.


Best,

John R Henry CPP

www.changeover.com
787-550-9650


#104 From: John Henry <johnhenry@...>
Date: Wed Jun 20, 2007 10:04 pm
Subject: Lean Changeover Newsletter June 2007-Pitstops in your plant & Pit crew training
johnhenry@...
Send Email Send Email
 

(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
### JUNE 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com


Interested in learning how to reduce changeover downtime? Let me present my workshop "Achieving Lean Changeover" in your plant. It is available in ½, 1 and 2 day versions or can be custom tailored to your needs. For more information e-mail me at johnhenry@... or call 787-550-9650

Some of you may think you missed last month's newsletter. You did not. Due to press of work and travel there was not one. (HINT: I could use some help. Guest essays are always welcome.)

SOME THOUGHTS ON...

PIT STOPS IN YOUR PLANT

The most interesting part of auto racing, to me at least, is the pitstop. I am always amazed at the amount accomplished in such a short time. A typical NASCAR pitstop takes about 15 seconds. During that time they not only get a full tank of gas, they may also get 4 new tires, a windshield change, suspension adjustment and a drink of water. In Formula I racing, due to different rules, it takes about half as long.

Pitstops are really what you do in your plant between products even if you call them changeover.

First let's look at motivation. Why do they do them so quickly?

They do it because they have to. If you ever watch auto racing on TV you know that the pit stop is probably the most important single part of the race when it comes to determining winners and also-rans. At a track speed of 200 miles per hour, one extra second in the pits results in 300 feet of distance on the track. In most races, the distance between the winning and second place cars is a dozen feet or less.

In other words, they do it for the same reason you need to speed up changeover in your plant: FOR THE MONEY! A manufacturing plant is only making money when it is producing. When it is not producing, it is spending money. Eliminating downtime from changeover will produce more profit.

The "why" is pretty easy. The "how" of a quick pit stop is much tougher and requires some thinking. A few of the things that go into a successful pit stop include:

Elimination-Only useful work is performed during the pit stop. All tasks have been examined and if they are not required, they are eliminated.

Externalization-All tasks that can be externalized are. For example, in NASCAR the lug nuts are glued to the wheel rim. This externalized placement means that the tire changer doesn't have to place the nuts during the pit stop. Fuel is pre-measured so that it does not have to be measured during dispensing.

Training-Each member of the pit crew has a specific task assigned and knows exactly how to carry it out. The jackman is responsible for placing the jack, lifting the car and releasing it when the tire changer is ready.

Staging-All tools, components such as tires and materials such as fuel are pre-staged and ready to go when the car pulls into the pits. No time is wasted looking for the tires. They are in the hands of the tire changer who already has one fot on the wall ready to go.

Tools-To the greatest extent possible, tools are eliminated. When tools are used they are specialized for the required purpose.

Scheduling-When to pit is an important part of race strategy. Pitting too early or late can cost valuable position.

Sound familiar? The same techniques will work in your plant.

Elimination-Are you performing unnecessary tasks during your changeover? If they are not required, eliminate them.

Externalization-What tasks can be performed either before or after the changeover? Remember, the total staffhours involved in changeover are nowhere near as important as the elapsed time that the line or machine is stopped.

Training-It is essential to determine optimum way to perform the changeover and document it. You must then train your people to assure that they know exactly what they are supposed to do as well as how and when they are supposed to do it.

Staging-All components and materials must be staged close to the line prior to commencement of changeover. Don't waste time looking for things that you already know will be needed.

Tools-The goal in changeover must be to eliminate tool usage. You can find a number of ways to do this in past newsletters in the "Tip of the Month". Typical examples include replacing nuts and bolts with handknobs, toggles, pins etc. Where tools cannot be eliminated, make sure that you have the proper tools readily available at the point of use.

Schedule-When we do changeovers will have an impact on how much time we lose to them. For example, if we are running red and white wines, we may be able to reduce cleanup times by running the white wine first. If we have two products in the same container, we can reduce changeover time by running them back to back.

Changeover must be viewed not only as a tactical requirement but as a strategic imperative for long term growth and survival. It is too important to leave to chance. If you don't do it right, your competition will.

One of my popular talks is "Pitstops in your plant" which describes why and how to make your changeovers more like pitstops. The PowerPoint for this talk has a number of illustrations of techniques I have used successfully. You are welcome to download it. at www.changeover.com/pitstops.ppt

TIP OF THE MONTH...
PIT CREW TRAINING

For those who want the experience of a real pitstop, Strategic Work Systems has a several workshops that combine hands-on pit experience with lessons on how this can be applied to lean manufacturing. For more info visit

http://www.swspitcrew.com/workshops

Tell them the changeover wizard sent you!

Best,

John R Henry CPP

www.changeover.com
787-550-9650


#103 From: "jrhfajardo" <jrhfajardo@...>
Date: Mon Apr 16, 2007 12:57 am
Subject: Lean Changeover Newsletter April 2007-Ishekawa chart & oil analysis
jrhfajardo
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
### APRIL 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================
SOME THOUGHTS ON...
ISHEKAWA CHARTS

Last month I talked about effective troubleshooting. This month I want
to talk about a helpful tool.

Shamless plug: If you are interested in information about having me
present my Effective Troubleshooting workshop in your plant, click
here www.changeover.com/trouble.pdf, e-mail me at
johnhenry@... or call me at 787-550-9650

The Ishekawa Chart is sometimes called a Fishbone chart or diagram. It
is a simple yet powerful tool for identifying the potential sources of
problems. One form has a horizontal line naming the problem at the
right. Four lines branch off at 45 degree angles with major groups of
possible causes of the problem. These are labeled "Machine", "Method",
"Man" and "Material".

Each of the angled lines has horizontal lines running to the left or
right detailing possible causes.

As an example, let us consider a rotary capper such as a Consolidated
or Pneumatic Scale. Let us assume that the problem is that caps are
not being tightened consistently. The major horizontal line would be
labeled "Inconsistent torque".

Branching off the horizontal at about a 45 degree angle would be
category lines or "bones". There should be at least 4 labeled Man,
Machine, Materials and Method. In some cases there might be more than
four, say for environment.

A series of horizontal lines then comes off each of the bones. All
possible causes are listed on those lines.

All possible causes of the inconsistent torque would be listed in one
of the four categories.

The "Materials" bone will list such potential causes related to
materials or components. Examples could include:
-Deformed bottles
-Oversized caps
-Excess mold release on the bottle or other causes
-Poor quality glue

"Man" related issues include anything related to or caused by
personnel operating the machine. This can include
-Improper setup or cleaning prior to the production run
-Failure to keep the machine clean during the run
-Improper technique in checking the cap torque. In other words, the
torque might be appear to be inconsistent but the problem is that the
operator is not checking it properly.

"Machine" can cover a wide range. It is important to remember that it
is not only the capper itself but includes anciliary equipment as
well. Machine problems include:

-Damaged or worn parts
-Vibration
-Overheating
-Damaged toque tester. The torque may be OK but the tester may be
indicating a problem.

"Method" includes all problems related to the way in which the capper
is operated:

-Speed may not be properly set. This could be a setup problem or it
could be a problem of the operator varying the speed during operation.
-The speed of other machines up and downstream may not be properly set
causing problems with the capper
-Over or underfilling the cap hopper can sometimes cause problems.

The above is meant to be illustrative not definitive. Those of you
will cappers will probably identify some things I have left out or
never experienced some of the things I mentioned. The Ishekawa chart
needs to be tailored to each piece of equipment as well as each major
problem.

There is also an issue of where to catagorize things. Is improper
setup an "man" or a "methods" item? It could be classed as either or
both. It could even be categorized as a "machine" problem if the
machine does not readily lend itself to repeatable setups.

The best time to develop an Ishekawa chart is either before or after a
problem occurs. A way to approach this is to develop a blank chart
template. A series of templates would be prepared for each machine. To
continue with our capper example, a series of blank charts would be
prepared with one each for "Inconsistent Torque", "Bottle Jam",
"Bottle breakage" and other major problems.

Some of the items could be filled in ahead of time simply by talking
with the mechanics and operators. To the extent that this can be done,
great. The charts should also be viewed as a work in progress. That
is, as new problems arise, they should be added to the charts. The
charts should be kept in close proximity to the machine to allow ready
access when troubleshooting.

In my experience, a lot of time is spent reinventing the wheel in
troubleshooting. A tool like the Ishekawa chart provides a means of
capturing the information and providing a starting point the next time
a similar problem occurs.

For an example of an Ishekawa chart that I use in my workshops, see
www.changeover.com/chart.jpg




TIP OF THE MONTH...
OIL ANALYSIS

Oil analysis is a useful tool for predictive maintenance. The oil from
a transmission, or crankcase can tell a lot about what the machine has
been doing. Typical information from an oil analysis includes metallic
& non-metallic particles, breakdown of lubricating properties,
dielectric breakdown, oxidation and fuel contamination.

It used to be that samples needed to be collected and sent to a
laboratory for analysis. In recent years more portable systems have
become available. One such system is the SKF TMEH1 OilCheck. This is
small, handheld system that allows oil analysis on the spot. It is
cheap enough that any maintenance shop can afford on.

It is available here
http://www.reliabilitydirectstore.com/Oil_Analysis_s/184.htm

Best,

John R Henry CPP

www.changeover.com
787-550-9650

#102 From: John Henry <johnhenry@...>
Date: Mon Mar 19, 2007 4:39 pm
Subject: Lean Changeover Newsletter March 2007 troubleshooting & Vibration
johnhenry@...
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
###     MARCH 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================
SOME THOUGHTS ON...
EFFECTIVE TROUBLESHOOTING


One of my popular in-plant workshops is “Effective Troubleshooting”. It teaches mechanics, technicians, engineers and others the basics of troubleshooting mechanical, electrical, control and other systems. This month I will share some of the highI thought that this month I would share some of the high points.

Let’s begin with a couple of definitions:

“Troubleshooting is the art of determining the cause of a problem in a system.”

“Effective troubleshooting is the art of doing it effectively.”

Anyone with any experience at it will agree that finding the problem in a system and the cause(s) is often harder and more time consuming that actually fixing it. An aggravating factor can be that there is no methodology used in the troubleshooting. The technician simply tries one thing after another until the system works again. Not only does this waste a lot of time, it can lead to aggravating rather than ameliorating the problem.

Here is the methodology I recommend and use:

Prior to beginning, understand how the system is supposed to. Some of this will come from some from general experience and training, some from specific training on the system, some from observation. If the technician does not understand how the system is supposed to work and the internal functions that cause it to work, it is unlikely that they will be able to get it to work. Or, if they do, it will be by random accident.

Most systems have visible as well as invisible functions. A labeler may dispense the label onto a tamp pad then apply it to the product with an air cylinder. The dispensing (via motor drive) and application are visible and easy to understand. There is also a complex series of timings that make sure that all these steps (and more) happen in the appropriate sequence and time. If the timing logic is not understood, it will be difficult or impossible to properly diagnose problems much less resolve them.

Once the system is understood the actual troubleshooting can start. I use a 5 step system. I will use the singular here for clarity. Bear in mind that there may well be more than one problem and more than one cause of the problem.

Step 1-Identify the problem

If you do not know what the problem is, it will be impossible to fix it. This is different from determining the cause of the problem. The operator may call and say “The capper is not working right.” That may say that there is a problem but does not give the first clue as to what the problem is. Is it starting and stopping? Running jerkily? Failing to apply caps? Failing to properly torque the caps?

This is an area where operator training can be very helpful. The more they can know about how the machine is supposed to work, the more information they can give describing the problem. Additionally, the better they know the machine, the more ability they will have to advise of a problem, or even a potential problem, before it becomes a catastrophic failure.

Step 2-Identify the root cause

The root cause may not be the same as the apparent cause of the problem. Toyota uses a technique (adopted from Henry Ford) called “The 5 Why’s” to get to the root cause. This technique uses a series of questions, each building on the previous answer, to find the true, underlying or “Root” cause of the problem.

An example:

Ask “why” 5 times:
(1) Why did Sarah slip and fall? Because there was oil on the floor.

(2) Why was there oil on the floor? Because the machine had a leaking shaft seal.

(3) Why was the shaft seal leaking? Because the shaft was damaged.

(4) Why was the shaft damaged? Because of improper tool usage.

(5) Why was an improper tool used? Because the proper tool was not available.


There are intermediate solutions at each of these steps that must be implemented. The oil must be cleaned up, the seal replaced and the shaft repaired. None of these is a final solution. If the root cause, improper tool usage, is not corrected the problem will recur and likely even get worse.

Step 3-Identify and choose the best solution

A key here is to realize that there is usually more than one dimension to “Best”. It may be the cheapest, it may be the fastest to implement, it may be one that is within the organization’s capabilities. It may also be a replacement and restoration to previous condition or it may include an upgrading. All these possible dimensions need to be considered.

The solution may also be temporary. If a machine used in production starts overheating, a temporary solution may be to direct a cooling fan on it until the end of the day rather than interrupt production. This may be fine, provided that when production stops the cause of the overheating is identified and corrected. It is probably not fine if 6 months or a year later the fan is still there.

Step 4-Implement the solutiion

Once the solution has been identified, it must be implemented. ‘Nuff said.

“A solution without implementation is nothing more than a good intention”-Peter S. Drucker.

Step 5-Document what was done.

If it is not documented, it did not happen. There needs to be a system log book or file where the problem, cause and resolution can be recorded. This not only makes the process easier the next time there is a problem, it also makes it possible to track trends. If the problem is recurring, it is likely that the true root cause is not being addressed.

The above is a 25 cent description of how to troubleshoot any system, obviously there is much more. If you are interested in having me present my Effective Troubleshooting workshop in your plant I am happy to do so. For a proposal or more information, please contact me johnhenry@... or by phone at 787-550-9650 during eastern US business hours.

TIP OF THE MONTH...
VIBRATION INDICATOR

One tool for monitoring system health is vibration analysis. There are sophisticated systems on the market costing tens of thousands of dollars that will give enough information to choke a large horse. These have been around for some time and are valuable tools. Price and complexity mean that they do not get used that often especially on smaller equipment.

There are currently available vibration meters that will fit in a shirt pocket. The sensor is pressed against a motor and a digital display gives frequency and amplitude. These meters are inexpensive (some less than $700) enough that there is no reason every mechanic or at least every shop should not have one. One source for these and many other good troubleshooting instruments is Reliability Direct at www.reliabilitydirect.com

Best,

John R Henry CPP


#101 From: John Henry <johnhenry@...>
Date: Tue Feb 20, 2007 12:09 am
Subject: Correction to the Lean Changeover Newsletter
johnhenry@...
Send Email Send Email
 
I sent out the Lean Changeover Newsletter today and it has an error
that needs correction.

I had mentioned the Powerpoint of Pitstops in your Plant but had the
link wrong.

It should be

http://www.changeover.com/pitstops.ppt

Sorry for any inconvenience.



Best,

John R Henry CPP

#100 From: "jimmy3jay" <johnh@...>
Date: Mon Feb 19, 2007 12:50 pm
Subject: Lean Changeover Newsletter Feb 2007 Ferrari & Wall Washing
jimmy3jay
Offline Offline
Send Email Send Email
 
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
###     FEBRUARY 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to:
quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================

If you have not done so yet, don't forget to buy Henry Ford's classic
book on lean manufacturing "My Life and Work" now in newly formatted
edition with a forwad by yours truly. Buy direct from the publisher
and save.
   https://xlibris.com/bookstore/bookdisplay.asp?bookid=32476


SOME THOUGHTS ON...
FERRARI PIT STOPS

I have long used the auto racing pitstop as a metaphor for lean
changeovers. See, for example, my presentation "Pitstops in your
plant" at www.changeover.com/pitstop.ppt Usually I use a NASCAR
pitstop because my audiences are more familiar with them. Formula 1
does it even better. Or at least faster. Typical NASCAR stops are
around 15 seconds. Formula 1 does them in 8-9 seconds.

I was thinking about this the other night while watching a program on
the history of Ferrari on the History Channel. It had some great race
footage including some pitstops. The first race in which Ferrari beat
its arch-rival Alpha-Romeo was in 1951. The two cars were running neck
and neck throughout the race until the final pitstop. The Ferrari team
was able to pull off an incredibly fast stop and get back on the track
to get and keep the lead.

Time for that stop? One minute and forty seconds.

Actually, this was pretty fast. Most pitstops at the time took over 2
minutes and some as long as 3. Watching the footage, it seemed more
akin to taking my car to the garage for service than a pitstop. The
car would pull in, the driver would get out, stretch, walk around, get
a drink of water and chat with the team manager. A crewman would
unscrew the gas cap and place a funnel into which fuel was poured.
Tire changing seemed positively leisurely.

Some of this may have had to do with the rules governing cars and
racing at the time. Even so, it seemed incredible to me. What were
these people thinking? It should not have been hard to cut the time at
least in half using the same number of people and techniques. The only
explanation I can come up with is that nobody figured out that a
second saved in the pit was a second gained on the track.

These were not stupid people. The folks who designed, built and raced
Ferraris and the other cars were geniuses.

Perhaps they were too close to the problem. Perhaps their focus was
too much on making the car go fast down the track and viewing other
issues as irrelevant. The car was not moving during the pitstop so
what happened there was not seen as very important.

Most of us would probably watch this program with some bemusement, as
I did. But in how many plants does a similar attitude occur? Many
plants focus on making a quality product in a highly efficient manner
and this is a good thing. Is too much emphasis placed on production at
the expense of non-production time such as changeover?

It is not enough for a plant to be highly efficient when it is
running. It must be highly efficient when it is stopped as well. When
a line stops for changeover (or for whatever other reason, it is
important to get it back up and running with as little delay as
possible. The pitstops were not long because they did not have
techniques for shortening them. They were long because nobody tried to
apply them. Look at your changeovers and ask yourself:

Do people know exactly what they are supposed to do and how?

Is the changeover sequence optimized to eliminate as much walking
around as possible?

Are all parts, components and materials available ahead before the
line stops so that downtime is not lost while looking for them?

Are proper tools available and being used correctly?

Can better, perhaps more specialized, tool be used to improve changeover?

These are fairly simple questions but, in my experience, not asked
often enough.

Are adjustments and settings being made precisely?

Just as it is important to get the car back on the track as quickly as
possible, it is important to get the production line "back on the
track" as quickly as possible. The key is to realize this and identify
opportunities to do so.

TIP OF THE MONTH...
WALL WASHING (revisited)

Last year I had mentioned a client's need for a better way to wash
walls in a manufacturing area. In looking about I had found a system
designed for washing billboards that seemed like it would do a pretty
good job. See
  www.tuckerusa.com/model_x.htm Recently I found an even better system.
This is the Core2Clean from VAI see
www.sterile.com/pages/products/products-core-2-clean-system.htm
This is a system purposely built for the pharmaceutical industry.
Instead of hoses, it has a pressurized tank in which the cleaning
solution can be batch mixed. The cleaning wand has a variety of
quickly demountable end attachments. Flow of the cleaning solution is
controlled by a comfortable hand trigger.

The Tucker system will be valuable in many uses. For those who need
something more, take a look at the VAI system.

John R Henry CPP

#99 From: John Henry <johnhenry@...>
Date: Tue Jan 16, 2007 1:45 pm
Subject: Lean Changeover Newsletter JANUARY 2007-Be Lazy! & thread gauges
johnhenry@...
Send Email Send Email
 


(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
###     JANUARY 2007
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to: quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================


Going to the  InterPhex conferences and exhibitions in San Juan next month? If so, you will have an opportunity to hear me speak on the topic of “Implementing a Lean Changeover Program”. This will be Friday morning, 2/2/07. Readers of this newsletter can get a 20% discount on any or all of the conferences by visiting www.interphexpuertorico.com/DS20

I will look forward to seeing everyone there.

If you have not done so yet, don’t forget to buy Henry Ford’s classic book on lean manufacturing “My Life and Work” now in newly formatted edition with a forwad by yours truly. Buy direct from the publisher and save.
  https://xlibris.com/bookstore/bookdisplay.asp?bookid=32476


SOME THOUGHTS ON...

BE LAZY!

Robert Heinlein is best known for his science fiction works such as “Starship Troopers” or “The Moon is a Harsh Mistress”. They are all good but one that has stuck with me through the years is the long short story called “The man who was too lazy to fail”. Basic story line: Boy is growing up in West Virginia, sees his father working in the fields. He figures he is too lazy to do that so goes to school. When his friends graduate and go to work in the mines, he is too lazy and goes to the Naval Academy. He finds the easiest job in the Navy is flying so becomes a Naval Aviator. Flying is hard work so he invents an automatic pilot. And so on. It is an interesting story in itself but what made it stick with me was the concept of what I would call creative laziness.

When I present my Achieving Lean Changeover workshops in client plants, many of the attendees come with impression that I am there to make them work harder and faster. In my experience, trying to get people to work harder and/or faster than the natural pace is like trying to teach a pig to sing. It frustrates the teacher and annoys the pig. What I want them to do is work less while doing it more slowly and carefully while reducing the time it takes for changeover. The only way to accomplish this seemingly contradictory goal is to eliminate work that is unnecessary.

I tell Heinlein story in my workshops and even have a slide that says “Be Lazy!”. It is not that I want people to be lazy in the sense we normally think of the word. I want people to be lazy in creative ways. I want them to find easier ways to do their jobs. To repeat, I want them to eliminate work that is unnecessary.

The initial reaction of most people is that everything they do is necessary. In some cases that may be true but in many cases, it is not.

CASE: I was presenting the workshop and we were focusing on changeover of a cartoner. The process called for a series of adjustments on each side of the machine. The way they did this was to adjust the first point on the front of the machine, walk around the end of the line and make the corresponding adjustment on the back. They would then make the next adjustment on the back and walk around to make the corresponding adjustment on the front. One of the operators noted that more than 5 minutes (by stopwatch) was being spent walking during the changeover. The first thought was to have two people working on this, one on the front, one on the back. This looked like it might take more time, getting the two people to the machine at the same time, than it would save. One of the operators asked if all the front adjustment could be made together prior to making the back adjustment. There seemed no reason why not, it was tried and on proving successful, implemented. This saved the mechanic 5 minutes or about 1/3 of a mile of walking per changeover. Walking is not productive work.

CASE: At the end of the batch, operators needed to remove bottles of tablets from the line for reconciliation. There were usually several hundred bottles. They removed the bottles 4-5 at a time and carried them to a nearby table. The table was modified by adding locking castors. Now, instead of bringing the bottles to the table, the table is brought to the bottles.

CASE: In a bottling plant, plastic bottles were laser coded on the shoulder. For each bottle height, the laser needed to be repositioned. The code was moved to the heel of the bottle. Regardless of bottle height/diameter, the centerline of the bottle at the heel is always in the exact same place. The cap is used to trigger the laser and no adjustment is ever necessary. The entire laser changeover was eliminated.

There are many other examples in all industries and all processes. I would be willing to bet cash money there are examples right in your plant.

These tasks continue to be done year in and year out for a variety of reasons. Perhaps the most common is simple inertia. That is the way it has always been done so that is the way it always will be done. Closely related to inertia is failure to look at each task to determine whether it is really necessary and take action to eliminate it when it is not. It takes an effort to break out of this zone but the effort will be worth it. Changeovers will be easier and better for eliminating all wasted work. This is really all Lean Manufacturing is. It might be better to call it Lazy Manufacturing.

In my workshops I pass out yellow lapel buttons made up that say “Be Lazy”. I will be happy to send one to anyone who requests it. Just drop me a note at
johnhenry@...

TIP OF THE MONTH...
THREAD GAUGE

An issue I frequently run into is incorrect use of threaded fasteners. People will use a metric nut on an SAE bolt, the wrong diameter fastener or the wrong thread. One way to help reduce this is to make sure that every mechanic is provided with a thread gauge. These can be purchased at any mill supply house but most of the ones I have seen leae something wanting. If they will tell internal/external diameters, they may be very large. If they measure thread pitch, they may not do anything else.

John Finch and I were commiserating about this problem a month or two back and it got me looking for a solution. I found it at http://www.boltdepot.com/thread-gauges.aspx
Bolt Depot sells a wide variety of threaded fasteners but one of the niftiest things in the catalog is a plastic gauge. They are available in metric or SAE. They measure OD, ID, thread pitch and length. They are made of plastic so should stand up to severe treatment. They are cheap enough at $1.50 that they don’t even need to.

Bolt Depot also has several size charts and gauges that can be printed out.

It is a site well worth visiting.


Best,

John R Henry CPP



Best,

John R Henry CPP

Visit the Quick Changeover website at http://www.changeover.com

Subscribe to the Quick Changeover Newsletter at http://www.changeover.com/newsletter.htm

#98 From: John Henry <johnhenry@...>
Date: Mon Dec 18, 2006 11:17 am
Subject: Lean Changeover Newsletter December 2006 Do it now! & Gripe Sheet
johnhenry@...
Send Email Send Email
 


(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
###     DECEMBER 2006
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to: quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================

NOW AVAILABLE-A NEW EDITION OF "MY LIFE AND WORK" by HENRY FORD WITH AN INTRODUCTION BY JOHN R HENRY

Click here to order
http://www2.xlibris.com/bookstore/bookdisplay.asp?bookid=32476


If you have not yet ordered your copy of the Quick Changeover Packaging report by Brian Wagner and myself, do it now! Visit www.packworld.com/qc for full details.

I will be speaking at InterPhex in San Juan on February 2, 2007. My topic will be "Designing a Lean Changeover Program". Full details can be found at www.interphexpuertorico.com

=============================================================

SOME THOUGHTS ON...
DO IT NOW!

There is a process to be followed in developing a lean changeover program. This includes developing the rationale for having the program, forming the team, analyzing the problem and developing solutions. This is all fine but it is not enough. As Peter Drucker said: Without implementation, the best laid plan is nothing more than a good intention.

Implementation is important for two reasons:

First, an investment has been made in getting to this point, there needs to be a payoff to recover it. Absent implementation, there will be no benefits to offet the costs.

Second, the team has been fired up and motivated. They have made good suggestions that everyone agrees make sense. Now they have to wait while their ideas work their way through the approval and budgeting process. As they are waiting, the fire and enthusiasm wears off. If implementation never takes place, they will see it as simply another example of TYNY (This Year’s New Thing) Most of us have been down that road. A new program is implemented, enthusiasm is generated and then it peters out. Then the next program comes along and it looks like just another exercise. Don’t let this happen to your Lean Changeover program.

In order to prevent this, it is important to identify some improvements that can be made immediately and do them. It is not important that these be the multi-million dollar savings. What is important is that they be visible and give the team as well as others in the plant the feeling that something is happening.

In one plant there was a washing up process. Machine parts were brought to the wash room on a cart and cleaned in a sink. The habit of the operators was to place the cart so that for each part, they had to turn 180 degrees from the sink, take 2 steps, pick up the part, turn 180 degrees back, take 2 steps and place the part in the sink. Nobody seemed to know what the reason for all this motion was. We instructed the operator to place the cart beside the sink. This allowed the to pick the parts off the cart without having to move from in front of the sink.

In another case conveyor guide rails required a wrench to adjust. Handlevers costing less than $5 each could be purchased without specific justification in the maintenance budget. A quantity of handlevers were purchased and during a routine changeover, the bolts were replaced.

At another plant the labeler at the discharge of the case packer had to be adjusted for each size case to center the label. Some research found that the only requirement was that the label be on the side of the case. There was no requirement for centering, it was done simply out of habit. The label position was relocated from to the lower leading edge of the case regardless of case size, eliminating labeler adjustment.
None of the above examples by themselves are exactly earth shaking in their impact. They do have one thing in common: They could be done with minimal or no cost and minimal or no red tape. People could see improvement happening right now. These minor “victories” built an enthusiasm for more, better and bigger “victories”.

Victories, by themselves, are not the whole story either. They need to be publicized. They need to be publicized within the group. We, as individuals, should be able to pat ourselves on our own backs when we accomplish something. We should be able to. In reality, most of us need some external reinforcement. This can come in many forms such as the plant manager stopping by and saying thanks for the efforts, posting of graphs and charts showing results and general review of team accomplishments. Quantify them. Show the costs of the improvements and show the benefits as well.

The victories need to be publicized externally too. Let everyone know about it. Articles in the company newsletter, recognition at events and the like. People must have a sens of pride in what they are doing or else they will find ways to stop doing it. One company I work with has a hall of fame in one of their main corridors. This has graphic charts, updated frequently, that show plant performance. Changeover initiatives are up there as well.

So stop talking the talk and start walking the walk, as John Wayne used to say. Do something now!


TIP OF THE MONTH...
GRIPE SHEETS

During operation, cleaning or disassembly of machinery operators and mechanics may notice items that need attention. These may be minor things that do not merit stopping the line such as an unusual, but not critical, noise. They may be more serious issues that caused a stoppage and a temporary repair. They might be things noticed in disassembly such as a cracked weld or a stripped bolt. In other words, things that may not seem urgent right now but if left unattended could cause a major breakdown later.

The tendency in too many cases is to either make a temporary repair and continue on or to ignore it completely if possible. Both actions will lead to trouble later.

Suppose a stripped bolt is noted in the disassembly of a capping machine. That has no effect on disassembly. There is probably time, while cleaning and other activities are taking place, to fix it.

But that assumes that someone knows it needs fixing.

Otherwise it is going to have to be fixed during reassembly and will delay getting the line up and running again.

One way to improve this situation is to borrow a page from aviation. They use a “gripe sheet” which is filled out at the end of each flight. The pilot notes anything that was not 100% right with the plane. The sheet is turned in and action is immediately taken to address the important issues. For other, non-critical issues, a work order will be generated and the repair scheduled.

An alternative way to do this is to have a “Gripe Log” where all gripes are noted. This then needs to be reviewed routinely to make sure they are being addressed.

Remember the adage that “It is not written down, it does not exist.” Reporting problems in writing does not guarantee they will be taken care of in a timely. On the other hand, not reporting it in writing may guarantee that it is not.


#97 From: John Henry <johnhenry@...>
Date: Tue Nov 14, 2006 1:39 am
Subject: Lean Changeover Newsletter NOVEMBER 2006-QCOP and Tennis Balls
johnhenry@...
Send Email Send Email
 


(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
###     NOVEMBER 2006
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to: quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================

NOW AVAILABLE-A NEW EDITION OF "MY LIFE AND WORK" by HENRY FORD WITH AN INTRODUCTION BY JOHN R HENRY

Click here to order
http://www2.xlibris.com/bookstore/bookdisplay.asp?bookid=32476



SOME THOUGHTS ON...
QCOP

So what exactly is QCOP? It comes from the title of a special report by Brian Wagner and myself titled “Quick Changeover Packaging” The report has just been published by Packaging World magazine. Visit
www.packworld.com/qc to order a copy.

OK, so what is Quick Changeover Packaging?

QCOP encompasses 2 areas: First is the operational area that most here are familiar with. That is the daily line changeovers to convert from one existing SKU to another. This is what we normally have in mind when we talk about “changeover. However, there is another changeover that is equally important. That is the more infrequent changeover from one package or product to another. An example of this was Folger’s Coffee’s change from metal cans with a seamed lid to plastic containers with a snap lid. My first thought, when I was asked to co-author the QCOP report was that these two types of changeover were apples and oranges. As I thought about it and started to get into the project, I realized that they were really two sides of the same coin and tightly intertwined.

Many products used to be standardized. The consumer had to take what was offered. Henry Ford was the epitome of this with his statement "Any customer can have a [Model T] painted any colour that he wants so long as it is black." (Buy his groundbreaking book “My Life and Work” at https://xlibris.com/bookstore/bookdisplay.asp?bookid=32476 to learn more)

Some here may be old enough to remember when Coca-Cola came in only a single flavor and a 6oz glass bottle. This is no longer the case. We as consumers now want what we want, how we want it, when and where we want it. Woe betide the producer who is unwilling to provide this level of choice. If Brand X will not supply it, Brand Y will.

Nor is this plenitude of choice enough. We want it cheaper too.

There are a number of reasons why consumers are now demanding almost extreme levels of choice. One reason is that we can. Another is the proliferation of marketing channels. Folger’s coffee used to be sold mainly in supermarkets. Now it is sold in supermarkets, hyper/super stores, convenience stores, warehouse/club stores, dollar stores and other venues. Each has its own quirks. Warehouse stores want multi-packs sold from pallet displays. Supermarkets want singles to display on a shelf. Dollar stores want a special size that permits them to sell at a dollar pricepoint.  Finally, the folks in marketing want to break out of the clutter of competing products. One way to do this is to offer a package and product that can be perceived as offering unique value to the consumer.

This is why you are doing so many line changeovers. Not to be a pessimist, but it is not going to get any better in our lifetimes. In fact, most of you can expect to do more changeovers each year rather than fewer.

Line changeover is a recurring task and can (or should) become routine. It often occurs daily or even more frequently. Product changeover eg; the Folger’s example, is rarer. Line changeover is driven by production schedules and the plant operating team. Product changeover is driven by marketing and package design people.

Too often, in my experience, these two groups view line and product changeovers as separate issues. They frequently have little or no communication between the two groups. This is a recipe for disaster.

ITEM-One manufacturer of hearing aid type batteries produced about 800 SKUs. The problem was that the cards on which they were packaged were 2 different sizes, one about 1/8" longer than the other. This caused hours of downtime daily in the plant.

ITEM-The package development team at a liquor company designed a commemorative bottle with an inverse taper. The first time the plant people saw the design was when 50,000 cases arrived on the loading dock. It could not run on existing lines because of the taper.

Many of you will probably have had similar experiences.

In addition to a multiplicity of SKU’s the product design is constantly changing. These changes are driven by such things as cost cutting, environmental friendliness and new packaging materials and technologies, to name a few. They are also driven by a need to make the product stand out in the clutter of competing products and capture the buyer’s mind share. In the report we quoted Roger Van Dusen, senior packaging engineer at Bacardi Global Manufacturing Americas, who said “We look to
change our packaging every two years. A few years ago, we changed it every
seven years,” Bacardi is neither alone nor even in driving this trend.

This frequent introduction of new or modified products needs to be coordinated with manufacturing and packaging. As noted above, minor changes in design can have a tremendous impact on line efficiencies. Designers need to discuss this with manufacturing early on in a project before getting locked into an inefficient design. Manufacturing, which generally has a large say in line design and equipment selection needs to know what the designer’s future plans might be. These might not be specific plans, the designers might not even know. But if manufacturing knows that additional changes are anticipated and something about what they might be, it will help in machine selection. If a product will be unchanged for 5 years, it might make sense to purchase highly efficient, but less flexible, equipment to run it. If a number of changes are anticipated in the next 5 years, more flexible machinery will be the way to go.

Careful coordination will also make a tremendous difference in the change from old to new. Poor coordination will almost guarantee cost over runs, stress on people and machinery, production and quality problems and, possibly, even backorders. Good coordination will make the transition as painless as possible.

Like it or not, line changeover and product changeover are closely tied together. Lines must be designed with flexibility in mind to assure that future products can be accommodated. Products must be designed with plant capabilities in mind to assure that they can be produced quickly and economically. This is not to say that product design must be slavishly tied to existing lines. Product design is and must continue to be market driven. It is to say that line capabilities must be considered. Sometimes a simple tweak to a product will mean the difference in running it on an existing line with little capital cost and quick introduction or the need to purchase a new line which not only incurs capital costs but can delay the introduction by months or even years.

Product and line changeovers are inseparably linked and this must be recognized be all concerned.

The QCOP report may be ordered at
www.packworld.com/qc

My co-author Brian Wagner is with Packaging & Technology Integrated Solutions LLC. Visit their website at www.pti-solutions.com

I would particularly like to acknowledge the giant role that Jim George of Packaging World played in editing this report. His assistance, suggestions and particularly editing was invaluable in creating a truly world class report.


TIP OF THE MONTH...
TENNIS BALLS

It is always amazing what you can learn just by keeping your eyes open. Last week I was at PackExpo. Wednesday afternoon I was hanging out in the lobby waiting for someone. While there I saw a concierge cleaning the floor of scuffmarks. You would think that in a place like McCormick they would have a very high tech way to do this but they don’t. They have a better way instead.

It looked like a standard tennis ball with a hole cut in it and stuck on the end of a broomhandle. It seemed a bit strange to me so I asked. Turns out that is exactly what it was. He used no cleaner or anything else, just the tennis ball. He showed me how it worked and it looked like magic.

So, this month’s tip is about as mundane and low tech as you can get. A tennis ball on a stick. It may be useful in other applications besides scuff marks. But even if it is not, it is still a neat trick to know.

It is also another example of the things you can see just by looking around. Don’t turn your mind off just because you have left work.

Best,

John R Henry CPP


#96 From: John Henry <johnhenry@...>
Date: Thu Oct 19, 2006 4:41 pm
Subject: Lean Changeover Newsletter October 2006-Addendum
johnhenry@...
Send Email Send Email
 
My apologies for the addendum, this should have
been in the October newsletter.

Brian Wagner and I recently wrote a major special
report for Packaging World titled "Quick
Changeover Packaging: Dynamics and Surging Growth
Opportunities" . This all new 135-page study was
edited by respected packaging journalist Jim George

• defines and quantifies the emergence of
quick-changeover packaging from both the marketing and operations perspectives

• explains why success depends upon marketing and
operations professionals working as a team

• examines changing market-side factors that have
created the "want it my way" consumer and retail
niches, and reshaped innovative thought

• includes advice, examples and worksheets to help readers build a QCOP model

And much much more.

For more information on the report including a
detailed table of contents and how to obtain a copy visit:

http://www.packworld.com/qc/



Best,

John R Henry CPP

Visit the Quick Changeover website at http://www.changeover.com

Subscribe to the Quick Changeover Newsletter at
http://www.changeover.com/newsletter.htm

#95 From: John Henry <johnhenry@...>
Date: Mon Oct 16, 2006 5:14 pm
Subject: Lean Changeover Newsletter October 2006-Henry Ford and Wall washing
johnhenry@...
Send Email Send Email
 

(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)
(+)+(+) S.M.I.L.E(sm)
(+)+(+)
(+)+(+) Setup Minimization Improves Line Efficiency
(+)+(+)
(+)+(+) The Lean Changeover e-letter
(+)+(+)
(+)+(+) Published monthly by Changeover.com
(+)+(+)
(+)+(+) Written by John R Henry, CPP
(+)+(+)
(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)
(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)(+)+(+)+(+)+(+)+(+)+(+)

###############################
###############################
###
###     OCTOBER 2006
###
###############################
###############################
============================================================

This newsletter is a free service of Changeover.com. Visit our website at
http://www.changeover.com or contact us at
john@...

Please feel free to forward this newsletter to anyone you think might be
interested

To subscribe send a blank e-mail to: quickchangeover-subscribe@yahoogroups.com

To unsubscribe send a blank e-mail to:
quickchangeover-unsubscribe@yahoogroups.com

Past issues are indexed and archived at www.changeover.com/newsletter.htm

=============================================================

NOW AVAILABLE-A NEW EDITION OF "MY LIFE AND WORK" by HENRY FORD WITH AN INTRODUCTION BY JOHN R HENRY

Click here to order
http://www2.xlibris.com/bookstore/bookdisplay.asp?bookid=32476

SOME THOUGHTS ON...
MY LIFE AND WORK by HENRY FORD


"I will build a motor car for the great multitude. It will be large enough for the family but small enough for the individual to run and care for. It will be constructed of the best materials, by the best men to be hired, after the simplest designs that modern engineering can devise. But it will be so low in price that no man making a good salary will be unable to own one--and enjoy with his family the blessing of hours of pleasure in God's great open spaces."

-Henry Ford

This is what Henry Ford set out to do in 1908 with the Model T. He not only set out to do it, he did it. The Model T was the most successful car in history. At one point, almost two thirds of all cars on the road were Model T’s. Between 1909 and 1927 Ford sold over 15 million of them. During this time, he cut the price from about $950 to under $300. Ford had a vision of how to do this. This vision goes today by the name of “Lean Manufacturing” and we think of it as something new that we have borrowed from the Japanese.

It’s not. Henry Ford realized a century ago that much of what is called “work” in many manufacturing plants would more accurately be called “waste”. The waste occurs in many forms.

-Cars were originally built in one place with workers walking around the car and moving from station to station. Ford realized that walking was non-productive. As he said:

“The undirected worker spends more of his time walking about for materials and tools than he does in working; he gets small pay because pedestrianism is not a highly paid line.”

The first step forward in assembly came when we began taking the work to the men instead of the men to the work. We now have two general principles in all operations--that a man shall never have to take more than one step, if possibly it can be avoided, and that no man need ever stoop over.”

-Much material was wasted and Ford was almost manic about reducing this. One example is that in punching out radiator caps, they wound up with a small brass disk that they treated as scrap. A bit of redesign later they were fabricating another part using that same “scrap” disk as the blank.

-I especially liked him on excess paperwork: “We had been collecting tons of statistics because they were interesting. But statistics will not construct automobiles--so out they went.”

-Ford believed, correctly I think, that only automation could eliminate drudgery and make people more productive. Only be becoming more productive could workers be worth more and hence paid more. His view, stated repeatedly, was that a man should never do any work that a machine could do. He was constantly looking for ways to improve the machinery.

-Ford realized that the only way to make a truly high quality (Quality=Absence of Variation) car, or any other product was via precise measurement of every possible variable. He used the most precise gauges available, even buying the Johansson Gauge Company of Sweden so he could have Carl Johansson (inventor of the Johansson gauge block) on his staff. One story is that the only 2 people who could walk into Ford’s office unannounced were his son Edsel and Johansson.

-Most importantly Ford recognized that even with all of the above, without the right people, motivated to perform their best, all he had was an empty building full of useless machinery. Ford did not care who a person was or their background, all that mattered was the willingness and ability to do their job. He was hiring handicapped before that was the fashion. He hired without regard to race and religion. I don’t think he has ever gotten the credit he deserves for this.

Ford made no secret about how he ran his business. He wrote 3 books on it. His first, “My Life and Work” is the best and most useful. The other two “Moving Forward” and “Today and Tomorrow” are valuable as well. While you are at it he also wrote a book on Thomas Edison “My friend Mr Edison” that is interesting.

In addition to writing, he was open in allowing tours of the factory and always willing to answer questions about his success.

Ford’s ideas worked in other settings as well. He applied them in enterprises as diverse as a public hospital, an industrial school, a railroad and shipbreaking. There is nothing magic about them. They are mostly just simple common sense. Or perhaps, given the failure to implement and follow up on them by American industry (Including Ford Motor Company) since, they are uncommon sense.

In short, there was and is no excuse for not implementing his ideas universally. But they were not. Except for some fairly low quality, photocopied versions of “My Life and Work” and “Moving Forward” they have been out of print for 70 years or so. Productivity Press at www.productivitypress.com has a nice edition of “Today and Tomorrow.

The books may have been out of print in English but they have never been out of print in Japanese. The Toyota Production System that we all hear so much about is mostly copied from “My Life and Work”. Rumor has it that Toyota requires every engineer to read it.

I have read at least 100 books on lean over the years. Some good, some not so good but almost always learning something interesting. When I finally found “My Life and Work” I was completely blown away. It makes all the other books worthless by comparison. I could not believe that it was out of print. I have recently remedied this. I have brought out a brand new edition, completely reformatted with a modern binding in a conveniently readable size. I even wrote an extensive introduction explaining why this book is so important.

You can purchase it by clicking: https://www2.xlibris.com/bookstore/bookdisplay.asp?bookid=32476

Quantity discounts are available.

NB: I will probably get some comments about what a horrible person Ford was so let me respond in advance. Yes, in many ways he was. That in no way diminishes the good ideas he expounds in this book. Read the book and implement the good. By all means feel free to write me though. I welcome all feedback, good or bad.

TIP OF THE MONTH...
WALL WASHERS

Some manufacturers have a need to wash down walls and ceilings as part of each changeover. This is often done with a sponge and squeegee on a pole. It may need to be repeated several times with detergent, clean rinse water and perhaps even a final rinse with purified water. On a recent project I did, this took a considerable amount of time and I began looking for better ways.

One idea I had was to look into equipment used for commercial washing of windows. This turned out to be not quite what was needed but did lead me to a company called Tucker USA at www.tuckerusa.com They make systems designed for washing signs, billboards, building exteriors and the like. It consists of a sponge/brush on a pole. Cleaning solution is fed through a hose in the pole to the brush. There is a second hose for the rinse that provides a spray for rinsing. These are Tucker’s Exterior Maintenance systems and the direct page is www.tuckerusa.com/model_x.htm In a long conversation I had with them it sounded like it would work well for our room cleaning application.

As always, if you contact them, I would appreciate mentioning where you heard about it.

My client has not yet implemented it but it looks very promising and the cost is reasonable. If any readers have used this or a similar system, could you please contact me at johnhenry@... to let me know how it worked out? If and when they do  implement it, I will post an update.



Best,

John R Henry CPP

Visit the Quick Changeover website at http://www.changeover.com

Subscribe to the Quick Changeover Newsletter at http://www.changeover.com/newsletter.htm


Messages 95 - 124 of 127   Newest  |  < Newer  |  Older >  |  Oldest
Advanced
Add to My Yahoo!      XML What's This?

Copyright © 2009 Yahoo! Inc. All rights reserved.
Privacy Policy - Terms of Service - Guidelines - Help